| Project design document form forCDM project activities(Version 05.0) |  |
| --- | --- |
|  |  |
| PROJECT DESIGN DOCUMENT(PDD) |  |
| Title of the project activity | Afam Combined Cycle Gas Turbine Power Project |
| Version number of the PDD | 10 |
| Completion date of the PDD | 23/02/2015 |
| Project participant(s) | The Shell Petroleum Development Company of Nigeria Limited (SPDC) |
| SPDC is a joint venture between: |  |
| Nigerian National Petroleum Corporation(NNPC)55% |  |
| Shell Nigeria(a subsidiary of Royal Dutch/Shell plc)30% |  |
| Elf Petroleum Nigeria Limited(EPNL,a subsidiary of TOTAL S A)10% |  |
| Agip(a subsidiary of ENI SpA)5% |  |
| Host Party | Nigeria |
| Sectoral scope and selected methodology(ies),and where applicable,selected standardized baseline(s) | Sectoral scope1:Energy generation, supply and transmission and distribution, |
| AM0029“Baseline Methodology for Grid Connected Electricity Generation Plants using Natural Gas” |  |
| Estimated amount of annual average GHG emission reductions | 550234tCO2 |

\ \\mathrm{t C O\_{2}}

* * *

SECTION A. Description of project activity

A.1. Purpose and general description of project activity

The "project activity", called Afam VI ("the project") is a 650 MW grid-connected combined-cycle gas turbine (CCGT) fuelled by natural gas. It is a build-own-operate power plant at Afam in Rivers State, Nigeria.

The power plant site is near to existing electricity generation plant that is now nonoperational, which existed prior to the start of implementation of the project activity, and which is owned by the Power Holding Company of Nigeria (PHCN), the successor to the National Electric Power Authority (NEPA). This older plant originally comprised four old, small open-cycle gas turbine (OCGT) units called Afam I-IV, consisting of around 75 MW of installed capacity, which are decrepit, beyond repair and have not been operated for many years. The site also contained an OCGT facility called Afam V, which was commissioned in 2002, consisting of 2 x 137 MW Siemens V94.2s gas turbines. These units are not in operational condition due to inadequate maintenance and poor operating practices.

The project is expected to reduce greenhouse emissions from power generation by over 500 000 tCO $ \_{2} $ per year, compared with the alternative plant that would have been built and operated in the absence of the project activity.

{\\mathrm{t C}}{\\mathrm{O O}}\_{2}

The project activity reduces greenhouse gas emissions because the $ \\mathrm{C O\_{2}} $ volumes emitted for each unit of electricity generated by the CCGT plant are lower than the quantity of $ \\mathrm{C O\_{2}} $ emissions that would otherwise be emitted by generating the same quantity of electricity from the baseline OCGT plant. Because the fuel is the same (natural gas), the emission reduction arises from the greatly improved thermal efficiency. The project will not displace other generation on the grid in Nigeria because there is a generation capacity deficit on the grid.

\\mathrm{C O\_{2}}

{\\mathrm{c O}}\_{2}

This is a conservative way to view the baseline. The alternative would be to consider the self-generation of electricity from small diesels that are not dispatched as part of the grid, but that may be expected to be displaced by the electricity from the project activity. This approach was considered by the project participants and included in the calculations of the choice of baseline emission factors. The Afam project was planned from the outset taking into account both the objective of minimising $ \\mathrm{C O\_{2}} $ emissions and of the need for certified emission reductions (CERs) to offset the additional investment required to minimise $ \\mathrm{C O\_{2}} $ emissions. In 2005, the lead project participant engaged consultants with the assistance of the World Bank/ GGFR for advice on methodologies and a project design document for the project. A baseline consisting of small diesel plant was considered as the baseline in considerable detail, and a new methodology was proposed for this purpose (NM0208). Elements from that proposed methodology were adopted by the Meth Panel and incorporated into the 'Tool to calculate the emission factor of an electricity system' (rather than approving the methodology for stand-alone use). This project

Using the methodology and the relevant tools as guides for calculating the GHG reductions, the estimated annual GHG reduction is 550234 tons of $ \\mathrm{C O\_{2}} $ , which is expected to remain stable over the ten year crediting period.

\\mathrm{C O\_{2}}

\\mathrm{{C O\_{2}}}

The project activity will make a valuable contribution to sustainable development in Nigeria.

* * *

Firstly, the new capacity addition to the grid will reduce the severe generation capacity deficit on Nigeria's electricity grid, thus improving its reliability. This deficit is exacerbated by the chronic unavailability of a significant proportion of installed capacity due to the poor state of repair of thermal stations and because hydro stations are affected by water level fluctuation and limitations on water availability. Because of the capacity deficit, it is expected that, in practice, the project will help to displace a portion of more emissions-intensive small dieselfired engines currently providing power to many grid connected customers, who prefer this costly option because of the unreliability of grid generation. For conservativeness and in line with the methodological tool "tool for calculating emission factor for an electricity system", a lower alternative project baseline has been selected in this PDD.

Second, the project will help improve the overall access to electricity for the people of Nigeria, particularly in the Niger Delta. At present, the country's annual per capita electricity consumption is just over 100 kWh. $ ^{1} $ This represents a very low level of development, on the threshold of Survival, where people's main concerns are simply food, water and shelter, and where health services are minimal. $ ^{2} $

Thirdly, the project development has provided important employment, training and development opportunities for the local community. A total of 877 (678 skilled,131-semiskilled and 69 unskilled) persons, mainly from the neighbouring communities are to be employed by the project during construction phase. Once in operation, the project will employ 50 skilled persons. These jobs will continue over the estimated project duration (20 years). As part of the project development, 140 youths from neighbouring communities will be given workforce training in areas such as welding to enable them acquire skills that will open up future employment opportunities to them. It will also facilitate technology transfer by building up the capacity in Nigeria for the operation of CCGT power plants.

Finally, the project also involves the upgrading of around 100km of ageing power lines to enhance the connection of 16 communities to power. While the electricity consumption of these communities will be relatively small compared with the capacity of the plant, these connections will contribute to sustainable community development. The current lack of electricity in some areas results in the burning of wood, charcoal and liquid fuels for basic daily needs such as cooking and lighting. Electricity can meet these needs more safely (by reducing the risk of fire and of burns to small children) and with none of the adverse health and social impacts (e.g. indoor air pollution, the amount of time spent collecting firewood and deforestation) that arise from the current fuels used. These are important benefits in addition to the contribution to improved education and incomes mentioned above. Therefore, to the extent that some of the electricity generated may meet previously unmet demand, it will contribute to sustainable development in Nigeria.

A.2. Location of project activity

A.2.1. Host Party

$ ^{2} $ Based on Starr, C (1997) "Sustaining the human environment: the next two hundred years" Daedalus, Vol. 125. The analysis presented by Starr suggested the following categories for per capital electricity consumption: $ 10^{2}= $ Survival (Food, water, shelter, minimal health services); $ 10^{3}= $ Basic Quality of Life (literacy, life expectancy, sanitation, infant mortality, physical security, social security):

{bf dot}10^{2}={\\sf S u r v i v}

* * *

The Federal Republic of Nigeria.

A.2.2. Region/State/Province etc.

The Afam power plant is located in Rivers State.

A.2.3. City/Town/Community etc.

The project is located in the Oyigbo Local Government Area (LGA) of Rivers State. The LGA headquarters are in Okoloma. The Afam power development area is bounded to the north by Imo River, to the east by a Ayama village, to the south by a Egberu village and to the west by Obiama-Asa village.

A.2.4. Physical/Geographical location

The project is approximately 30 km northeast of Port Harcourt, the capital of Rivers State and lies roughly between 7.2545 E, 4.8480 N and 7.2600 E, 4.8525 N decimal degrees respectively. The project site covers 22.67 ha.

Figure 1 shows a map of the Afam VI project site and surrounding area; Figure 2 shows a plot plan of the site layout. Figure 3 shows a map of the Nigerian transmission and distribution grid and its clear delineation.

* * *

Figure 1: Map of the Afam VI project site and surrounding area

* * *

Figure 2: Plot plan showing layout of the Afam VI project site

WTP = Water treatment Plant

ACC = Air Cooled Condenser

CCW = Closed Cooling Water system

CCB = Central Control Building

WW/Sewage TP = Waste Water/Sewage Treatment Plant

* * *

Figure 3: Map of Existing NEPA Transmission Lines in Nigeria $ ^{3} $

A.3. Technologies and/or measures

The project activity involves reducing emissions from electricity generation by enhancing the performance of gas-fired power generation plants that provide electricity to the Nigerian grid. The history and status of power generation at the Afam site is outlined below (Table 1).

Table 1: Background to generating units at Afam power plant

|  | Year commission | Size | Type | STATUS | Owner/operator |
| --- | --- | --- | --- | --- | --- |
| AfamⅠ | 1962 | 4x13.5MW(~56MW) | OCGT | Explosion in 1997. Out of use since then and subsequently scrapped due to obsolescence | PHCN |
| AfamⅡ | 1976 | 4x23.9MW(~92MW) | OCGT | Explosion in 1997. Out of use since then. Planned rehabilitation of 2 units in 2011. | PHCN |

^{4}\\underset{(\\sim56;\ \\mathrm{M W}}{(\\sim56;\\mathrm{M W})}

* * *

CDM-PDD-FORM

| Afam III | 1978 | 4x27.5MW(~112MW) | OCGT | Explosion in 1997. All units broken down with one of the units down on broken turbine compressor blades. | PHCN |
| --- | --- | --- | --- | --- | --- |
| Afam IV | 1982 | 6x75MW(~450MW) | OCGT | Explosion in 19972 units partially worked for a while thereafter before falling into disrepair. All are down due to broken turbine compressor blades. Planned reconditioning of these units in 2011. | PHCN |
| Afam V | 2001 | 2x138MW(~276MW) | OCGT | Failed in 2005 due to lack of maintenance and have not worked properly since | PHCN |
| Afam VI | GTs-07/09ST-12/10 | 3x150MW1x200MW(~650MW) | CCGT | This project activity | SPDC |

- The entire NEPA Afam I-IV Station shut down in 1997 except for Afam V which was shut down in 2005 due to poor maintenance. Practically, all the units were run far in excess of the recommended running hours before overhaul. Afam I-V are not in operation due to poor maintenance, and are undergoing rehabilitation by PHCN to add somewhere between 270-403 MW of capacity (see: The Nigerian Voice (2010) PHCN begins work on Afam I-IV power plant. 4 May 2010; and, Federal Presidency of Nigeria (2010) Roadmap for Power Sector Reform. August 2010. Chapter 3, pg 51 outlines the status of Afam plants in 2010.

The design calls for technology of an international standard to be implemented, as specified in the Environmental Impact Assessment and consistent with the project participants' environment, health and safety practices. The Afam VI gas turbines will be installed with dry low $ \\mathrm{N O\_{x}} $ combustion equipment. The height of the exhaust stacks is specified in the Environmental Impact Assessment to ensure that emissions and prevailing ambient air quality will comply with the Laws of Nigeria, all relevant Consents and World Health Organisation and World Bank guideline limits at the time of financial commitment.

\\mathrm{N O}\_{}

The operation of a combined cycle plant is considerably more technically complex than an open cycle plant. To ensure the transfer of new skills, Nigeria is actively involved in the project through National Petroleum Investment Management Services (NAPIMS), which is part of the Nigerian National Petroleum Company (NNPC). The design, construction and operation of the project involve international staff working with local Nigerian staff, ensuring sustainable knowledge transfer. In addition to NAPIMS involvement, SPDC employs many Nigerian nationals as engineers and other professionals who are actively engaged on the project.

| Party involved(host) indicates host Party | Private and/or public entity(ies) project participants(as applicable) | Indicate if the Party involved wishes to be considered as project participant(Yes/No) |
| --- | --- | --- |

Version 05.0

* * *

\| Nigeria(host Party) \| The Shell Petroleum Development Company of Nigeria Limited (SPDC).
SPDC is a joint venture between:
· Nigerian National Petroleum Corporation(NNPC)55%
· Shell Nigeria(a subsidiary of Royal Dutch/Shell plc)30%
· Elf Petroleum Nigeria Limited(EPNL,a subsidiary of TOTAL S A)10%

Agip(a subsidiary of ENI SpA)5% \| No \|
\| \-\-\- \| \-\-\- \| \-\-\- \|

A.5. Public funding of project activity

No public funding has been used for the project.

SECTION B. Application of selected approved baseline and monitoring methodology and standardized baseline

B.1. Reference of methodology and standardized baseline

Title: Approved baseline and monitoring methodology AM0029 (Version 03), "Baseline Methodology for Grid Connected Electricity Generation Plants using Natural Gas". This PDD also makes use of Version 06.0.0 of the "Tool for the demonstration and assessment of additionality" and of Version 2.2.1 of the methodological tool "Tool to calculate the emission factor for an electricity system".

B.2. Applicability of methodology and standardized baseline

The project activity meets the applicability criteria set out in AM0029:

- The project activity is the construction and operation of a new natural gas fired gridconnected electricity generation plant.

- The geographical/ physical boundaries of the baseline grid can be identified and information pertaining to the grid and estimating baseline emissions is publicly available. $ ^{4} $


4 Estimating baseline emissions in this case does not require the ex post estimation of a grid emission factor. Nigeria does not have sufficient installed generating capacity to meet demand and therefore new plants need to be dispatched to the maximum extent possible: they do not displace other grid-connected (i.e. centrally-dispatched) plants. Many consumers in Nigeria - particularly industry and large commercial buildings, but also households who can afford the generators and the fuel - have their own diesel generators to supplement the grid when supply is interrupted, or as a far more expensive but more reliable alternative to grid-supply. Therefore, in practice, the project is expected to displace high emissions from diesel reciprocating engine generators on consumers' sites. However, this PDD is based on the more conservative baseline of the alternative power plant technology, which is gas-fired OCGT. Therefore, the actual emission reductions will be larger than those calculated under this PDD.

* * *

- Natural gas is sufficiently available in the Rivers States region of Nigeria, and there is significantly greater scope for the expansion of gas-fired grid-connected power in the region such that future natural gas based power capacity additions, comparable in size to the project activity, are not constrained by the use of natural gas in the project activity. Therefore, future natural gas based power capacity additions, comparable in size to the project activity, are not constrained by the use of natural gas in the project activity.

Table 2: Demonstration of project applicability

| Applicability criteria | Project activity applicability |
| --- | --- |
| The project activity is the construction and operation of a new natural gas fired grid-connected electricity generation plant. Natural gas should be the primary fuel5. | The project activity is the construction and operation of a new 650 MW combined cycle gas turbine(CCGT)plant, comprising3x150MW gas turbines and1x200MW steam turbine.The electricity generated will be supplied to the regional power grid and natural gas sourced from the regional gas grid will be the primary fuel.No auxiliary fuel(e.g.diesel)will be used as part of the project activity;the project activity will be fully fired by natural gas in CCGT mode. |
| The geographical/physical boundaries of the baseline grid are clearly identified and information pertaining to the grid and estimating baseline emissions is publicly available. | Nigeria's electricity grid is severely constrained.With only3.8GW grid capacity against an estimated demand of10GW,Nigeria has considerable suppressed and unmet demand6with only around40% of Nigeria's population of150 million people having access to electricity7.Furthermore,much of the installed capacity is unavailable due to the poor state of repair of thermal stations and also because hydro-electric power stations are affected by fluctuations in water level and limitations to water availability.Just over2GW of the installed generation capacity is currently available to generate at any given time.Consequently,the grid is plagued by poor power quality(such as under-voltage conditions)and frequent power outages of long duration because load shedding is required to balance supply and demand.In response,most industrial and commercial business customers,and residential customers with sufficient capital,have invested in their own diesel generators.Survey data shows that these generators range in size from1kVA up to over3800kVA per unit.There is estimated to be some3.6GW of non-residential diesel generation capacity and900MW of residential diesel generation capacity.8Although the cost of operating these units is higher than the grid tariff,they provide a reliable supply when it is needed,which is essential for business operation.Information relating to the state of the Nigerian electricity grid,including the existing supply constraints and demand deficit are publicly available.The extent and geographic boundaries of the grid are shown in Figure 3. |

$ ^{5} $ Small amounts of other start-up or auxiliary fuels can be used, but can comprise no more than 1% of total fuel use, on an energy basis.

$ ^{6} $ See: Prasad. V.S.N. Tallapragada (2008) Nigeria's Electricity Sector - Electricity and Gas Pricing Barriers, International Association for Energy Economics, Cleveland, USA.

$ ^{7} $ See: BP Statistical Review of World Energy, June 2011.

$ ^{8} $ See: J. Ikeme and Ebohon J. O (2005) Nigeria's electric power sector reform: what should form the key objectives? Energy Policy, Vol.33 (9) pp.1213-1221.

* * *

| Applicability criteria | Project activity applicability |
| --- | --- |
| Natural gas is sufficiently available in the region or country. | Natural gas supply in NigeriaLatest statistics(June 2011)suggest thatNigeriahas the9th largest proven gas reservesin the world,with187 trillion cubic feet(Tcf)of proven high grade natural gas$ ^{9}$.The majority of the natural gas reserves are located in the Niger River Delta.In 2007,Nigeriaproduced1204 billion cubic feet(Bcf)of natural gas,while consuming456 Bcf.Following supply constraints due to underinvestment,in February 2008the Nigerian government approved a package of measures to improve the medium-to long-term development of the gas sector that includeda new gas pricing policy and a Gas Master Plan that identifies the future gas infrastructure network to be built by potential investors and promotes new gas-fired power plants to help reduce gas flaring and provide much-needed electricity generation.The short/medium term gas supply plan was to triple production capacityto2042MMscf/dby the end of2009to enable total gas-fired generating capacity to grow to over6,000MWby the end of2009.$ ^{10}$Since then,the Government of Nigeria has revised the short-term goals of the Gas Master Plan to a supply of natural gas of1636MMscf/dby April 2011,with a view to supportingcirca7000MWof electricity generation capacity.$ ^{11}$there is no up-to-date data available to corroborate whether this goal has been met.The supply plan aims to ensure that domestic gas demand is met,and provisions are made to prioritise domestic supply overLNGexports. |
| Natural gas is sufficiently available in the region or country.(cont'd.) | Natural gas supply in the regionIn the Rivers State regionwhere the project is located,around30-40MMscf/dof associated gas and180MMscf/dof non-associated gasis available to the regional gas network operated by the Nigerian Gas Company(NGC)serving a maximum domestic demand of150-180MMscf/d.In addition,the Okoloma gas plant(adjacent to the Afam gasand power project and supplying gas since October2008)has a production capacity of240MMscf/dof non-associated gas.In addition,the project is connected to the NGC regional gas network.The capacityofAfam VIis not constrained by the production capacity of theOkolomadevelopment;the gas production capacity fromOkolamawill be sufficient to supply over2GWofnewCCGTcapacityorabout1.5GWofOCGTcapacity.Natural gas is therefore abundantly available in theregion to meet the project activity requirements.The project activity doesnot constrain future capacity additions in the area,as evidenced by thefact that other natural gas based power plants have recently beenbuilt andare planned in the region,for example byTotal at theObite powerplant located inOML58(planned)和byEni atOkpai.$ ^{12} $On the basis ofthe above,it can be concluded that the project would not give rise toprice-inelastic gas supply constraints during the crediting periodwhich could result in significant leakage impacts. |

10 See: Prasad. V.S.N. Tallapragada (2008) Nigeria's Electricity Sector - Electricity and Gas Pricing Barriers, International Association for Energy Economics, Cleveland, USA.

12 The Obite power project is being developed by Total in OML58, see [http://www.total.com/en/our-energies/natural-gas-/power-generation-940907.html](http://www.total.com/en/our-energies/natural-gas-/power-generation-940907.html). Total launched a call for tender for support for the CDM aspects of the Obite project in May 2011. The Okpai power project received CDM support through a flare reduction project at the Kwale - see CDM project reference 0553, registered 9th November 2006. Other major CCGT power projects under development include Omoku and Alaoji, both located in Rivers State.

* * *

CDM-PDD-FORM

B.3. Project boundary

The emission sources in the project boundary are as follows:

- Emissions from the combustion of natural gas in the Afam VI plant.

- The amount of electricity exported to the electricity grid from the Afam VI plant.


The amount of electricity generated is used to determine the emission reductions achieved by operating the Afam VI plant in combined cycle mode compared with the baseline scenario of an open-cycle plant of equivalent output capacity.

Table 3 shows the emission sources and gases included in or excluded from the project boundary.

* * *

Table 3: Emissions sources included in or excluded from the project boundary

| Source |  | GHGs | Included? | Justification/Explanation |
| --- | --- | --- | --- | --- |
| Baseline scenario | OCGT power generation | CO2 | Yes | Main emissions source in the baseline |
| CH4 | No | Excluded for simplification. |  |  |
| N2O | No | Excluded for simplification. |  |  |
| Project scenario | CCGT power generation | CO2 | Yes | Main source of emissions in the project activity. |
| CH4 | No | Excluded for simplification. |  |  |
| N2O | No | Excluded for simplification. |  |  |

\\overline{{\\mathrm{{C O\_\_{2}}}}}

\ \\mathrm{C H\_{4}}

\\overline{{\ {\\sf N\_\_{2}O}}}

\\overline{{\\mathrm{C O\_{{}2}}}}

\\overline{{\\mathsf{C H}\_{4}}}

\\overline{{\\mathrm{{N}O}}}

Figure 4 shows the project boundary.

Figure 4: Schematic illustration of the project activity within CDM project boundary

* * *

B.4. Establishment and description of baseline scenario

In the baseline activity, 650 MW of OCGT generating capacity would be required to generate the equivalent amount of electricity.

The methodology requires project participants to use the following steps to identify the baseline scenario:

Step 1: Identify plausible baseline scenarios

The analysis undertaken in relation to these steps is described below.

Step 2: Identify the economically most attractive baseline scenario alternative

Step 1: Identify plausible baseline scenarios

The methodology requires that identification of alternative baseline scenarios should include all possible realistic and credible alternatives that provide outputs or services comparable with the proposed CDM project activity. These alternatives are required to be in compliance with all applicable legal and regulatory requirements. Therefore, the following options have been assessed:

- The project activity not implemented as a CDM project;

- Power generation using natural gas, but technologies other than the project activity;

- Power generation technologies using energy sources other than natural gas;

- Import of electricity from connected grids, including the possibility of new interconnections.


The analysis provided below assesses the following three critical criteria required by the methodology for identifying 'plausible baseline scenarios' from a total of nine 'potential plausible baseline scenarios' identified in accordance with the above options:

1. Compliance with applicable legal and regulatory requirements

2. Is the baseline scenario 'realistic and credible' and


Note on criteria used to determine 'plausible baseline scenarios'

Plausible options should be in compliance with the state and national policies relating to power generation and distribution. Options considered 'realistic and credible' include those alternatives for which the technology is commercially established and available; those alternatives which are within the investment capacities of the promoters; those alternative technologies that are prevailing; and/or power plant technologies that have recently been constructed or are under construction or are being planned. Options that might deliver outputs comparable to the CDM project activity might include those alternatives that provide similar output in terms of the peak load factor, peak versus base load power and power quality; and/or those alternatives for which the cost of generation is lower than grid power.

3. If implemented, could the alternative deliver outputs comparable to the CDM project activity?

* * *

Table 4: Consideration of baseline scenario options

| Scenario description | Compliance with applicable legal and regulatory requirements? | Realistic and credible? | Outputs comparable to the CDM project activity? | Conclusion on plausibility as baseline scenario |
| --- | --- | --- | --- | --- |
| Option 1: Project activity not implemented as a CDM project |  |  |  |  |
| Natural gas power generation using combined cycle(CCGT) technology without CDM Efficiency:50%Lifetime:20+ years | Yes | There are other CCGT power plants operating in Nigeria (typically connected with CDM investments).These include at Kwale/Okpai and Obite(planned).Other projects being developed by NDPHC(Omoku and Alaoji) | Yes | Plausible baseline scenario |
| Option 2:Power generation using natural gas,but technologies other than the project activity |  |  |  |  |
| Natural gas power generation using open cycle(OCGT)Efficiency:36%Lifetime:20+ years | Yes | Yes,OCGT is an established power generation technology that is usually favoured in the region where gas is available due to low capital costs(relative toCCGTandother fuel options),low national gas prices and simpler operation and maintenance needs.The Nigerian Government has approved the building of a number of open cycle gas turbine plants13. | Yes,due to the grid capacity deficit,OCGT would operate as base-load plant on the Nigerian grid | Plausible baseline scenario |

$ ^{13} $ See: [http://www.mbendi.com/indy/powr/af/ng/p0005.htm](http://www.mbendi.com/indy/powr/af/ng/p0005.htm).

* * *

| Scenario description | Compliance with applicable legal and regulatory requirements? | Realistic and credible? | Outputs comparable to the CDM project activity? | Conclusion on plausibility as baseline scenario |
| --- | --- | --- | --- | --- |
| Option 3: Power generation using coal |  |  |  |  |
| Coal-fired power generation using conventional steam cycleEfficiency:36%Lifetime:20-30 years | Yes(subject to potential application of atmospheric pollution controls) | No. Whilst Nigeria holds significant coal reserves,they are largely undeveloped since the discovery of oil and gas in the 1960's.Whilst there are longer-term targets to develop coal-fired power generation, the Governments short-term priority is on gas to power.14Further,given(a) higher capital costs for coal plant compared to gas15and(b) low cost of domestic gas,coal generation is not currently considered a viable option.There have been no grid-connected coalfired power plants built in recent years in Nigeria. | Yes, coal-fired installation would operate as base-load plant | Not plausible |

$ ^{14} $ Federal Presidency of Nigeria (2010) Roadmap for Power Sector Reform. August 2010. Chapter 3.

15 Coal-fired steam cycle power generation- $2,200 per kW; gas-fired combined cycle - $1,100 per kWe (IEA/OECD estimates of typical investment costs in 2010). See [www.etsap.org/E-](http://www.etsap.org/E-) techDS/EB/EB E02 Gas fired%20power gs-gct.pdf and [www.etsap.org/E.../EB](http://www.etsap.org/E.../EB) E01 Coal fired power FINAL revGS161109.pdf

* * *

| Scenario description | Compliance with applicable legal and regulatory requirements? | Realistic and credible? | Outputs comparable to the CDM project activity? | Conclusion on plausibility as baseline scenario |
| --- | --- | --- | --- | --- |
| Option4：Power generation using oil(e.g. diesel/HFO) |  |  |  |  |
| Oil-fired power generation using conventional steam cycle Efficiency:38-44% Lifetime:20-30 years | Yes | No, oil-fired generation has not been common practice for large-scale power plants in the region (or worldwide) over the past two decades.Insufficient Nigerian oil refining capacity means that refined products(e.g.diesel/HFO) would need to be imported at much higher cost compared to alternative domestic fuel(s) including natural gas.Between 2009 and 2011,diesel prices have varied betweenN90-150 per litre(see below for more detail on cost comparison).17 | Yes, due to the grid capacity deficit, oil-fired power generation would operate as base-load plant in Nigeria, if the fuel was available. | Not plausible |
| Option5：Power generation using hydropower |  |  |  |  |
| Large-scale hydropower plant(或 cluster of smaller units)Lifetime:>50 years | Yes | No,the higher capital costs and lead times would not represent an economically viable project in the absence ofCDM.Hydropower resources are not available in the region,where the topography is flat(Nigeria's hydropower plants are located in the Northeast).18Would require significant transmission additions with long lead times.Longer term target for Government of Nigeria.19 | No,would not deliver outputs comparable to the project activity(i.e.base-load power generation) due to power intermittency and low load factor.Seasonal nature of rainfall in Nigeria limits development of hydropower. | Not plausible |

[http://www.oilgasarticles.com/articles/88/1/Downstream-Oil-and-Gas-and-Refining-in-](http://www.oilgasarticles.com/articles/88/1/Downstream-Oil-and-Gas-and-Refining-in-) Nigeria/Page 1.htm and US DOE FIA Nigeria Country Brief

17 See: [http://www.businessdayonline.com/NG/index.php/news/76-hot-topic/18992-companies-profits-jobs-in-danger-as-diesel-price-hits-roof-](http://www.businessdayonline.com/NG/index.php/news/76-hot-topic/18992-companies-profits-jobs-in-danger-as-diesel-price-hits-roof-)

18 See: Report of the Vision 2020 National Technical Working Group on Energy Sector. July, 2009. Locations of hydro resources are shown in Section 2.4.2.

* * *

| Scenario description | Compliance with applicable legal and regulatory requirements? | Realistic and credible? | Outputs comparable to the CDM project activity? | Conclusion on plausibility as baseline scenario |
| --- | --- | --- | --- | --- |
| Option6:Power generation using wind |  |  |  |  |
| Large-scale array of grid-connected wind turbinesLifetime:15-20 years | Yes | No,the higher capital costs and lead times would not represent an economically viable project without CDM or similar support.Sufficient wind resources are not available in the region,and limited consideration of the potential of wind power to date;the most ambition scenario suggests only 1% of national electricity supply from wind by2020.^{20}$ | No,would not deliver outputs comparable to the project activity(i.e.base-load power generation) due to power intermittency and low load factor | Not plausible |
| Option7:Power generation using other renewable sources |  |  |  |  |
| Biomass;solar;tidal;waveLifetime:20 years | Yes | No,higher capital costs and unproven regional demonstration of plants preclude economic viability without CDM or similar support.Most ambition target for biomass is1000MWof installed capacityby2020.^{21}$ | No,would not deliver outputs comparable to the project activity(i.e.base-load power generation) due to power intermittency and low load factor.Reliable biomass fuel supply chains are not developed in region. | Not plausible |
| Option8:Power generation using nuclear |  |  |  |  |
| Nuclear power generationEfficiency:30%Lifetime:40 years | National policy does not currently permit private sector investment in nuclear power | No,there are no existing nuclear power plants in Nigeria and the national nuclear policy in Nigeria is unresolved.The only nuclear plant inAfrica is in South Africa.Ambitious goal of installing1500MWby2015^{22}seems unlikelyto be fulfilled because safety concerns likely to override such ambitions(Nigeria struggles to maintain gas-fired power plant fleet). | Yes,nuclear power generation would operate as base load plant | Not plausible |

2015^{2}}

$ ^{20} $ See for example, limited consideration of wind in Report of the Vision 2020 National Technical Working Group on Energy Sector (page 108) and Roadmap for Power Sector Reform op cit.

21 See: Report of the Vision 2020 National Technical Working Group on Energy Sector (page 111).

$ ^{22} $ See: Report of the Vision 2020 National Technical Working Group on Energy Sector (page 105).

* * *

| Scenario description | Compliance with applicable legal and regulatory requirements? | Realistic and credible? | Outputs comparable to the CDM project activity? | Conclusion on plausibility as baseline scenario |
| --- | --- | --- | --- | --- |
| Option 9: Import of electricity from connected grids, including new interconnections |  |  |  |  |
| Import of electricity from other regions/countries | Unknown; Nigeria does not import electricity | No. Nigeria has only one interconnector,a132kV link with Niger built in 1976.This link is located in the northeast of Nigeria,over1,000kmfrom the project and has a maximum capacity of40MW. $ ^{23} $ Even if the import capacity was higher,the Nigerian grid is insufficient to transmit the required power to the River State region The132kV link has allowed hydroelectricity to be exported from Nigeria to Niger over the past decade;Nigeria has never imported power via this link $ ^{24} $ as Niger is unable to export sufficient power to the Nigerian grid.$ ^{25}$ | No,the interconnector and Nigerian grid system are unable to provide base load power equivalent to the project (limited to40MW) | Not plausible |

Note on use of off-grid diesel power generation

In addition to the (on-grid) options considered above, the use of off-grid diesel power generation could be considered as a plausible baseline scenario for meeting Nigerian electricity demand. The current practice to cope with the deficit of available capacity on the Nigerian grid (and intermittent supply from available grid capacity) is for industrial, commercial and residential customers with sufficient capital to invest in off-grid diesel-fired reciprocating engines. There is estimated to be some 3.6 GW of non-residential diesel generation capacity and 900 MW of residential diesel (see Figure 6 below). The electricity generated by these units is expensive: the fuel cost alone makes the electricity considerably more expensive than grid electricity (when available). $ ^{26} $ The up-front capital cost of these units limits their use to businesses and higher income households. In the context of Nigerian

23 See: World Bank Report No. 32149 on Niger Energy Project (15 April 2005) : [http://lnweb90.worldbank.org/oed/oeddoclib.nsf/DocUNIDViewForJavaSearch/940A328EB0D35B5](http://lnweb90.worldbank.org/oed/oeddoclib.nsf/DocUNIDViewForJavaSearch/940A328EB0D35B5) F85257070007F3EC3/$file/ppar\_32149.pdf

$ ^{25} $ See: World Bank Report No.32149 on Niger Energy Project (15 April 2005); link provided above

$ ^{24} $ See [http://www.indexmundi.com/g/g.aspx?c=ni&v=83](http://www.indexmundi.com/g/g.aspx?c=ni&v=83) power supply and grid infrastructure constraints, development of new grid-connected capacity would displace power generation from these units.

A modification to the "Tool to calculate emission factor for an electricity system" was approved at EB50 to include provision for displacement of off-grid generation. This is applied to this PDD by showing that the emission reductions that would arise from the displacement of off-grid diesel generation are considerably higher than the emission reductions from the selected OCGT baseline. The thermal efficiency levels are similar, but the CO2 emission factor for diesel is higher than for natural gas. $ ^{27} $

Based on the above analysis, the following options are identified as plausible baseline scenarios:

Option 1: Project activity not implemented as a CDM project

Option 2: Power generation from natural gas using OCGT

Further analysis of the economic attractiveness of these two plausible baseline scenarios' is presented below, in order to identify the most economically attractive baseline scenario alternative.

Step 2: Identify the economically most attractive baseline scenario alternative

The most economically attractive baseline scenario alternative was identified using standard investment analysis in current US$ to calculate the project Internal Rate of Return (IRR) for both baseline options. Project IRR is an established financial indicator used by banks, financial institutions and project developers when assessing project investment choices. Note that the analysis does not account for the salvage value and working capital returned. This is due to two reasons. Firstly, according to SPDC it is very difficult to put a value on the working capital returned and it would very likely be negligible. Secondly, a sensitivity analysis for a range of salvage values indicated that the IRR is hardly affected. For example, varying the salvage value between 0% and 20% of present capital expenditure resulted in variations in IRR of maximum 0.2%. Table 5 summarizes the key assumptions and outputs (project IRR) for the two scenarios identified as plausible alternatives to the project activity (Option 1 and Option 2) as applicable at the time of investment decision-making for the project activity (2005).

Note also that the Afam PPA is dated December 2005 and has a term of 20 years. The investment analysis undertaken as part of this PDD assumes a 20 year financial period from the start of normal operations (e.g. supply of electricity from Afam VI). This in turn means that the current PPA does not fully cover the entire expected operational period of the power plant. However, a full 20 year period has been chosen for several reasons. Firstly, the cessation of the PPA would not necessitate the closure of the power plant and/or its financial

$ ^{27} $ A survey undertaken in the PDD accompanying NM0208 found that the weighted average thermal efficiency for new off-grid diesels in Nigeria was 37.4%.

* * *

operations; upon termination of the PPA, the required contractual arrangements would be reached - albeit possibly under different financial and political circumstances. Secondly, a large-scale CCGT project (particularly one located in a region where there is a chronic shortage of grid power supply and growing demand) would typically be expected to operate for 20 years or more. Finally, given a degree of uncertainty regarding the operational life of the plant and the future form of any new contractual arrangements, an assumed period of 20 years is deemed conservative; for shorter financial periods (e.g.15 years), the IRR reached by the project in the absence of CERs would be reduced- thereby also reducing the likelihood that the project without CERs reaches the investment hurdle rate across the variations of parameters, as documented in the sensitivity analysis (see Section B.5 below).

From the summary results provided in Table 5, it can be seen that for Option 1: Project activity not implemented as a CDM project, the project IRR is 15.8% whereas for Option 2: Power generation from natural gas using OCGT, the project IRR is significantly higher at 27.6%. An investor not concerned with the reduction of $ \\mathrm{C O\_{2}} $ emissions would therefore choose the OCGT option rather than the CCGT option.

{\\mathrm C O\_{2}}

These results are based upon a conservative estimate of the relative cost of OCGT compared with CCGT (for both capital and annual costs, which are significantly lower for OCGT plant). In reality, the difference in IRR between the OCGT and CCGT plant would likely be significantly greater. The investment analysis clearly indicates that investment in the gas-fired OCGT plant (Option 2) would have been the most economically attractive option at the time of the investment decision and this therefore constitutes the baseline scenario. As stated above, the capital cost assumptions for the OCGT baseline option are conservative: if the International Energy Agency (IEA) value of OCGT costs being 60% of the equivalent CCGT costs $ ^{28} $ were applied, then the IRR for the OCGT option would be 37%. The economics from the relative gas and electricity prices in Nigeria clearly indicate that an OCGT plant constitutes the baseline investment option.

$ ^{28} $ Assumptions underlying the IEA's World Energy Outlook, 2008.

* * *

Table 5: Technical and financial factors relevant to the project activity

| Assumptions \[notes\] |  |
| --- | --- |
| Capacity | \ |
| GT capacity |  |
| ST capacity |  |
| Total installed capacity\[1\] |  |
| Plant lifetime |  |
| Investment costs |  |
| Total plant investment cost\[2\](cost per kW installed) |  |
| Fuel costs |  |
| Net plant thermal efficiency\[3\] |  |
| Plant load factor(assumes base load) |  |
| Plant availability factor\[4\] |  |
| Net power generation | 5 |
| Fuel requirement | 10 |
| Fuel requirement(1MWh=3.6GJ) | 36 |
| Fuel requirement(NCV=35MJ/m3) | 1 |
| Fuel cost\[5\] |  |
| Annual fuel cost |  |
| Operating costs |  |
| Annual O&M costs\[6\] |  |
| Revenues |  |
| Power capacity payment\[5\] |  |
| Power commodity payment\[5\](effective equivalent wholesale power tariff) |  |
| Annual electricity revenues |  |
| Financial performance |  |
| Project IRR(over 20 years) |  |

| CCGT power plant(Option 1) |  | OCGT power plant(Option 2) |  |
| --- | --- | --- | --- |
| Values | Units | Values | Units |
| 450 | MW | 650 | MW |
| 200 | MW | - | MW |
| 650 | MW | 650 | MW |
| 20 | years | 20 | Years |
|  |  |  |  |
| 423.8 | $ million | 296.66 | $ million |
| 652 | $/kW | 456 | $/kW |
|  |  |  |  |
| 50 | % | 36 | % |
| 90 | % | 90 | % |
| 95 | % | 95 | % |
| 124600 | MWh | 5124600 | MWh |
| 249200 | MWh | 14235000 | MWh |
| 397120 | GJ | 51246000 | GJ |
| 054203 | 000m³ | 1464171 | 000m³ |
|  | $/MWh |  | $/MWh |
|  | $/ million |  | $/ million |
|  |  |  |  |
| 30.2 | $ million | 21.2 | $ million |
|  |  |  |  |
|  | $/MW hour |  | $/MW hour |
|  | $/MWh |  | $/MWh |
|  | $/MWh |  | $/MWh |
|  | $ million |  | $ million |
|  |  |  |  |
| 15.8 | % | 27.6 | % |

000,m^{3}

See workbook "Afam PDD cash flow v25\_NOTES ADDED" for how these have been applied to demonstrate and assess additionality Notes:

\] The CCGT efficiency figure represents the assumption used by SPDC throughout the process of project evaluation

\[1\] This is the capacity contractually committed, based on a conservative estimate of the performance of the units in local ambient air temperature conditions and is therefore slightly lower than the units' name plate rating.

\[2\] Total cost to completion for CCGT plant calculated at time of investment decision, based on detailed itemised payments for plant costs provided by equipment suppliers (Daewoo); see EPC contract signed 9 December 2005. The capital cost for an equivalent OCGT plant has been estimated by applying a conservative multiplier of 0.7 to the CCGT capex figure; this is consistent with assumptions made in the IEA World Energy Outlook 2005, Middle East and North Africa Insights (where 2005 investment costs are given as $350/kWe for OCGT and $500/kWe for CCGT). The fact that this estimate is conservative can be seen, for example, from the fact that the IEA assumes (for the World Energy Outlook 2008) that OCGT costs are 60% of CCGT costs. Using this value would result in a baseline IRR value of 37% for the OCGT option.

30^{\\mathrm{t h}} payments are expressed in dollars per MW per hour and power commodity payments are expressed in dollars per MWh.

\[6\] The value for the CCGT plant (project) represents the conservative annual value of the Long Term Service Agreement (LTSA) scheduled and unscheduled maintenance provided by the lowest contract bidder at the time of final investment decision (FID), whose NPV at the time of the investment decision was calculated by SPDC to be $161.02m for a contract period of 15 years. The O&M value represents the present value discounted at a rate of 17% (as with the capital costs). The value for the OCGT plant is based on the same ratio as the capital costs consistent with the IEA World Energy Outlook sources referred to above, where O&M is assumed to be the same percent of Capex for OCGT and CCGT. This is consistent with the expectation that O&M costs for the much simpler OCGT plant would be expected to be lower than for the CCGT plant. The magnitude of the O&M cost is at the higher end of the expected range internationally (see, for example, IEA, Projected Costs of Generating Electricity, 2005 and 2010 editions).

As required by the methodology, a sensitivity analysis was performed in order to confirm this conclusion. The sensitivity analysis of the project financial performance was performed by subjecting both baseline scenarios (Option 1 and Option 2) to potential variation in the following critical parameters:

- Investment cost

- O&M costs

- Natural gas price

- Electricity price


The financial performance was calculated for a 10% deviation for each parameter, reflecting potential variations for these factors within the project crediting period. The results of the sensitivity analysis are presented in Table 6 below (values shown are project IRR):

Table 6: Sensitivity analysis on baseline and project IRR

|  | Option1 | Option2 | Option1 | Option2 |
| --- | --- | --- | --- | --- |
| Sensitivity1: Investment cost | 10% increase |  | 10% decrease |  |
| 13.8% | 21.5% | 18.2% | 36.7% |  |
| Sensitivity2: O&M costs | 10% increase |  | 10% decrease |  |
| 14.7% | 25.2% | 16.9% | 29.9% |  |
| Sensitivity3: Natural gas price | 10% increase |  | 10% decrease |  |
| 15.3% | 26.6% | 16.2% | 28.7% |  |
| Sensitivity4: Electricity price | 10% increase |  | 10% decrease |  |
| 19.5% | 33.7% | 12.1% | 22.0% |  |

The choice of OCGT technology as baseline scenario is confirmed with the calculation of the baseline emission factor. This is done in Section B.6.and follows the methodological tool "Tool to calculate the emission factor for an electricity system" v2.2.1

* * *

B.5. Demonstration of additionality

As per the methodology, the project proponent is required to establish that the GHG reductions due to the project activity are additional to those that would have occurred in absence of the project activity. The latest version of ACM0029 (Version 03) requires the following steps to be taken:

- Step 1: Benchmark Investment Analysis

- Step 2: Common Practice Analysis

- Step 3: Impact of CDM Registration


The methodology describes for each above step, which sub-steps of the latest version of the "Tool for the demonstration and assessment of additionality" (Version 06.0.0) must be followed. The application of Step 1 (Benchmark Investment Analysis); Step 2 (Common Practice Analysis); and Step 3 (Impact of CDM Registration) are described below.

Step 1: Benchmark Investment Analysis

The methodology requires the following sub-steps contained within the latest version of the "Tool for the demonstration and assessment of additionality" to be followed:

- Sub-step 2b: Option III. Apply benchmark analysis

- Sub-step 2c: Calculation and comparison of financial indicators

- Sub-step 2d: Sensitivity analysis


Apply benchmark investment analysis

The investment analysis of the project activity has been undertaken using the project Internal Rate of Return (IRR) as the financial indicator. A cost of capital benchmark needs to be selected that is appropriate for the Afam power project. The Afam power plant is financed by the Shell Petroleum Development Company of Nigeria Limited (SPDC) joint venture (JV) partners. SPDC is the operator of a Joint Venture Agreement involving the Nigerian National Petroleum Corporation (NNPC), which holds 55 per cent, Shell 30 per cent, EPNL 10 per cent and Agip 5 per cent. In Nigeria, the expected IRR for a project needs to be considerably higher than it would be in a developed market economy to justify the country risk. $ ^{29} $ The commercial structure for the project cannot be described in classic project financing terms, nor can it be categorised in simple corporate financing terms, due to the multi-party JV.

Since a generic project finance weighted average cost of capital (WACC) adjusted for Nigeria country risk is not suitable, and a corporate WACC is similarly inappropriate, the rate on Nigerian commercial bank debt has been chosen as being the most appropriate alternative benchmark. This is considered to provide a conservative (low) benchmark for the opportunity cost of capital in Nigeria.

29 For one simple example of what country risk can mean, the Afam project site was the subject of a militant attack, which resulted in unexpected additional costs to the project from damage and security-related measures of US$50 million.

* * *

Figure 5: Nigerian prime lending rate (2004-2010)

Source: plot of data from the Central Bank of Nigeria. See [http://www.cenbank.org/rates/mnymktind.asp](http://www.cenbank.org/rates/mnymktind.asp);
[http://www.cenbank.org/OUT/PUBLICATIONS/STATBULLETIN/RD/2005/2004%20STAT-BULL-PART%20A.PDF](http://www.cenbank.org/OUT/PUBLICATIONS/STATBULLETIN/RD/2005/2004%20STAT-BULL-PART%20A.PDF);
[http://www.cenbank.org/OUT/PUBLICATIONS/REPORTS/RD/2007/STABULL-2005.PDF](http://www.cenbank.org/OUT/PUBLICATIONS/REPORTS/RD/2007/STABULL-2005.PDF)

On this basis, for the purposes of the benchmark analysis, an IRR below 17% has been considered insufficient to justify the country risk for large capital investments such as the Afam power project.

Comparison of financial indicators are shown in the Excel workbook "Afam PDD cash flow v25\_NOTES ADDED", which all suggest that the OCGT is the most economically attractive option, and the project activity is only an attractive investment option i.e. exceeds the IRR hurdle rate if the revenues from CERs is taken into account (the project IRR of the project activity without CDM revenues has been calculated as outlined in Step 3 "Impact of CDM registration" below). Sensitivity analysis

As with the sensitivity analysis undertaken under Step 2 of section B.4 (i.e. 'Identification of the economically most attractive baseline scenario alternative'), the following parameters were considered critical to the economic performance of the project activity:

- O&M costs

- Electricity price

- Natural gas price


* * *

CDM-PDD-FORM

Table 7: Sensitivity analysis on project IRR without CERs

| Sensitivity 1: Investment cost | 10% increase | Base investment cost | 10% decrease |
| --- | --- | --- | --- |
| 13.8% | 15.8% | 18.2% |  |
| Sensitivity 2: O&M costs | 10% increase | Base O&M cost | 10% decrease |
| 14.7% | 15.8% | 16.9% |  |
| Sensitivity 3: Natural gas price | 10% increase | Base natural gas price | 10% decrease |
| 15.3% | 15.8% | 16.2% |  |
| Sensitivity 4: Electricity price | 10% increase | Base electricity price | 10% decrease |
| 19.5% | 15.8% | 12.1% |  |

The results of the sensitivity analysis confirm that the IRR of the project activity without CDM revenues is lower than the benchmark for the project activity required by investors for comparable project activities in Nigeria, under circumstances which could bring about reasonable variations in the parameters used in the IRR calculations. However, two exceptions are noted and require explanation. If the electricity tariff received by the project is increased by 10%, the project is seen to pass the benchmark IRR hurdle rate. However, this condition is considered to be unlikely given the political sensitivity of electricity price increases, the history of low power prices in Nigeria and difficulties with electricity bill collection in Nigeria and the Rivers state region. More importantly, the tariffs are defined in the Afam project Power Purchase Agreement (PPA), which sets the tariff price for electricity for 20 years. Similarly, if the investment cost were to decrease by 10% the project is seen to pass the benchmark IRR hurdle rate. This sensitivity is theoretical, and not practical since the value used in the baseline calculation is based on the actual contracted total investment cost for the project (quoted by Daewoo to SPDC at the time of FID) not including contingencies and unforeseen

The values for each of the variable parameters at which the benchmark IRR hurdle rate (17%) is passed were also calculated. In order to reach the benchmark, one or more of the following conditions would need to be satisfied:

- The investment cost would need to decrease significantly from $423.8m to $398.5m
- The O&M costs would need to decrease significantly from $30.2m per year to $26.9m

For the reasons outlined above, the likelihood of one or more of these conditions arising,and being considered feasible at the time of the investment decision, is negligible. Note that the natural gas price values used in the analysis are also real values as contained, and therefore contractually set, in the Afam project PPA. Furthermore, note that the O&M costs would almost certainly be higher than the conservative value chosen for the purposes of the

- The electricity price would need to increase from $18.70/MW/h (capacity payment) and $0.50/MWh (commodity) to $19.39/MW/h (capacity payment) and $0.52/MWh (commodity)

30 The total plant investment costs (excluding the costs associated with raids in 2007) total $564.4m as of August 2011, which is significantly above the anticipated project investment cost at the time of Final Investment Decision.

* * *

calculation; a significantly higher cost bid was chosen by the project sponsor than the value used here (which is based on the lowest cost bid provided). In addition, the costs quoted by the bidder(s) are the subject of a contractual service agreement rather than estimates provided by the project sponsor. The possibility of the chosen O&M cost value decreasing by such a significant level is therefore considered to be unfeasible.

The above analysis therefore confirms that the project activity without CDM revenues is financially unviable across a range of realistic variations in the critical parameters determining project IRR and that therefore hence CDM revenues are required to implement the project activity.

Step 2: Common Practice Analysis

The methodology requires the following sub-steps contained within the latest version of the "Tool for the demonstration and assessment of additionality" to be followed according to 'common practice analysis':

- Sub-step 4a: Analyze other activities similar to the proposed project activity

- Sub-step 4b: Discuss any similar Options that are occurring


The common practise analysis requires analysis of the extent to which the proposed project type (e.g. technology or practice) has already diffused in the relevant sector and region.

In line with the "Tool for the demonstration and assessment of additionality v.06.0.0", we have focused on plants that are currently operational, of similar scale (325 MW to 975 MW) and use similar technology (CCGT). The regional scope considered is Nigeria. We have identified only two thermal power plants in Nigeria of similar size and technology to the proposed project $ ^{31} $ . Table 8 below provides an overview of these plants. All other CCGT power plants located in Nigeria are either not completed yet - and therefore not operational (e.g. Obita, Omoku, Egbema and Alaoji CCGT plants), have considerably larger capacity than Afam IV (e.g. Sapele plant with 1050MW) or are too small for comparison- and have been constructed long before Afam or indeed the CDM existed (e.g. Kolo Creek built in 1983 with capacity of 40MW).

Table 8: Similar activities considered for best practice

Analyze other activities similar to the proposed project activity (Sub-step 4a)

Nigeria Agip Oil Company (NAOC) has recently built a 480 MW grid-connected CCGT power plant at Okpai. This project is also located in the Rivers State region of Nigeria (i.e. the same

$ ^{31} $ Projects were identified from the following sources [http://www.industcards.com/cc-nigeria.htm](http://www.industcards.com/cc-nigeria.htm) which is based on Platts UDI World Electric Power Plants Data Base

[http://www.nigeriaelectricityprivatisation.com/wp-content/uploads/downloads/2011/01/Geregu-Genco-2011-01-13.pdf](http://www.nigeriaelectricityprivatisation.com/wp-content/uploads/downloads/2011/01/Geregu-Genco-2011-01-13.pdf) region as the Afam VI project location), and has been constructed under the same economic and market context i.e. constraints to national power grid. The project capacity size is similarly typical for a modern CCGT plant (450-700 MW). This project is directly using gas produced in association with oil that was previously flared at Kwale Oil and Gas Processing Plant. The project proponent has to date not claimed any emission reduction credits for the downstream displacement of more carbon intensive forms of electricity generation. $ ^{33} $ However, this project has been registered as a CDM project activity (December 2006), claiming CDM credits for the flare abatement component of the project under AM0009. The choice of low emission CCGT technology is therefore considered to be linked to the upstream flare reduction CDM project.

The Geregu power station is located in the State of Kogi and is currently in the process of being privatised. It is still operated by the State-owned Power Holding Company of Nigeria. It was commissioned in 2007 by the then President of Nigeria President Obasanjo. Geregu was the first new greenfield power plant to be funded and commissioned by the President's administration. The project has not been supported by CDM financing and so far no application for CDM status has been undertaken.

A number of other CCGT plants are currently being developed in Nigeria, most notably Egbema, Alaoji and Okitipupa. At the time of writing, these are not operational and face substantial challenges to completion - either due to financing, logistics or security threats and are therefore not included in the common practice analysis. In accordance with the methodology tool, we therefore do not include them in our analysis.

Discuss any similar Options that are occurring (Sub-step 4b)

The Okpai power plant has been undertaken as a CDM project. However the focus of the CDM credits for the Okpai project was on gas flaring reduction. The Okpai project is the most similar project to the Afam IV project activity due to its geographic proximity, its government independent ownership, size (480 MW) and technology type (CCGT). It provides clear evidence that financial support through CDM credits is required to make these types of projects economically feasible in Nigeria. A number of other projects in Nigeria have obtained CDM financing for gas flaring reduction efforts.

For the Geregu CCGT power plant, no exact details of financing are available. It is only known that the project was financed entirely by federal government funds. This makes this project not directly comparable to the Afam IV project, as the investment decision might not have been made on purely commercial grounds alone but could have been influenced by non economic factors such as social and political considerations.

As the Afam project is a measure involving the switch of technology without a change of energy source, it is subject to additional quantitative analysis of "common practice" as outlined in paragraph 47 of the "Tool for the demonstration and assessment of additionality v06.0.0". This involves several steps as follows:

Step 1: Plant range, +/- 50% of capacity/output of planned power plant

33 Although the project proponents understand that this was initially considered in the project design, but elected to be removed for final project submission.

* * *

Table 9: Plant capacity and output ranges used for common practice analysis

|  | Capacity(MW) | Output(MWh) |
| --- | --- | --- |
| Planned project | 650 | 5,124,600 |
| +50% = | 975 | 7,686,900 |
| -50% = | 325 | 2,562,300 |
| Technology type: | CCGT | CCGT |

Step 2 - Number of plants that deliver the same capacity/output in the same geographical area

The next step is to determine which plants in the geographical location of the project activity are comparable in capacity/output as the project activity. For this purpose, the geographical area is assumed to be the Nigerian electricity grid. The relevant year for the assessment is 2005 and before, as the project start date is December 2005. On this basis, $ N\_{all} $ is determined as follows (Table 10).

\\mathbb{N}\_{\\mathrm{a l}}

Table 10: Power plants data used to determined plants with the same capacity/output in the same geographical area as the proposed project activity

| Power plant | Technology type | Installed CAPACITY of Power Plants (MW) | Electricity generation (MWh) in 2005 | Year of Commissioning |
| --- | --- | --- | --- | --- |
| NESCO \* | Hydro | - | - | - |
| AGGREKO | OCGT | - | - | - |
| GEOMETRIC \*\* | Diesel | - | - | - |
| CALABAR | OCGT | - | 202 | 1934 |
| AFAM(I-IV) | OCGT | 931.6 | 1,838,934 | 1963-2001 |
| DELTA | OCGT | 882 | 3,235,212 | 1966 |
| KAINJI | Hydro | 760 | 2,586,929 | 1968 |
| SAPELE | OCGT | 1020 | 878,417 | 1978 |
| JEBBA | Hydro | 578.4 | 2,268,230 | 1985 |
| EGBIN | OCGT | 1320 | 8,592,097 | 1986 |
| SHIRORO | Hydro | 600 | 1,236,090 | 1989 |
| AES | CCGT | 302 | 2,018,364 | 2001 |
| OKPAI\* | CCGT | 450 | 1,343,611 | 2005 |
| AJAOKUTA | OCGT | 110 | 80,597 | 2006 |
| OMOKU | CCGT | 100 | 422,355 | 2006 |
| OMOTOSHO | OCGT | 335 | 383,266 | 2007 |
| GEREGU | CCGT | 414 | 378,603 | 2007 |
| OLORUNSOGO | OCGT | 335 | 103,591 | 2007 |
| IBOM | OCGT | 37 | 3,204 | 2009 |
|  | N...= | 5 | 2 |  |

\\underline{{\\mathbb{N}\_{a\\mathrm{l l}}}}=

\ {mathbb N N}\_{\\mathrm{a l}}=

* * *

Number of plants in geographical area with CAPACITY >325MW <975MW

> 325M<{975M}

Number of plants in geographical area with OUTPUT >2,652,300 MWh <7,686,900 MWh

- Data from NESCO Power Plant is not considered it operates as an isolated system. Okpai excluded as CDM.

All plants constructed after December 2005 are excluded as this is after the proposed start date of the project activity.

Plants marked in red are those that fall within the same capacity/output range as Afam VI (the proposed project activity).

Step 3 - Plants that deliver the same capacity/output but apply different technologies to Afam project activity

The next step is to determine which plants have the same capacity or deliver similar output to Afam VI, the proposed project activity, based on the ranges shown above in Table 9, but employ a different technology. For the purpose of this assessment, OCGT is considered a different technology to CCGT. Based on the technology types and the $ N\_{all} $ assessment shown in Table 10, this gives an $ N\_{\\mathrm{diff}} $ for capacity of 5, and a $ N\_{\\mathrm{diff}} $ for output of 2.

\\mathbb{N}\_{\\mathrm{a l}}

N\_{\\mathrm{d i f f}}

Nmathsf{{d i f}}

Step 4-F factor calculation

4-F

Table 11: Results of common practice analysis

The F factor provides an insight into the share of power plants connected to the grid which employ the same technology as that of the proposed project activity. It provides the key metric for assessing common practice. In the case of the analysis presented in Steps 1-3 above, the following results can be drawn (Table 11).

|  |  |
| --- | --- |
| Factor F(1-Ndiff/Nall)=Nall-Ndiff= |  |

| CAPACITY | OUTPUT |
| --- | --- |
| 0.00 | 0.00 |
| 0.00 | 0.00 |

(1-\\mathsf{N} _{\\mathsf{d i f f}},/,\\mathsf{N}_{\\mathsf{a l l}})=

The analysis shows that the F factor is < 0.2, and $ N\_{\\mathrm{all}}-N\_{\\mathrm{diff}}<3 $ . Therefore, the project activity s not considered to be "common practice".

The registration of the project activity will assist in promoting thermally efficient use of natural gas in the Nigerian power sector. Revenues from CDM would help support the continuing operation of the project and employment in the region. It will also help to alleviate issues such as plant staff technical capacity. Moreover, CDM registration will help raise the importance of the project activity's contribution to climate change mitigation and sustainable development, gaining positive recognition among the local community, industry and policymakers. The project activity is considered to be additional. Because the baseline project (without CDM registration) represents a similar project in terms of fuel type, PPA arrangements and the contribution to the regional grid, potential impacts upon the power sector and electricity market (other than those identified above) have not been considered material.

<0.2

\\sf{N} _{a l l}-\\sf{N}_{d i f f}<3.

* * *

decision, the project IRR of the project activity with CDM revenues was estimated to be 17.1% (see Excel workbook "Afam PDD cash flow v25\_NOTES ADDED"). This calculation was based upon additional project revenues (compared to the project activity undertaken without CDM) from CERs over a ten year crediting period according to the estimated emission reductions (ER) that could be expected from the project at the time of investment decision-making, namely: emission reductions of 804,972 $ \\mathrm{tCO\_{2}} $ per year $ ^{34} $ and assuming a CER price of $ 7.04/tCO\_{2}. $ ^{35} $ It was therefore determined that the project activity would only be above the financially attractive benchmark if the project activity attains CDM revenues through sale of the emission reductions.

804,{9sf72},\\up{\\updot C O}\_{{2}}

\\sharp\\T.04/\\up{\\mathrm{C O}\_{2}}^{\ 5}

\\operatorname{y e a r}^{34}

Since the calculation of the chosen value for $ \\mathrm{E F\_{B L, C O\_{2}, y}} $ of 0.511 tCO $ \_{2} $ /MWh - and subsequent changes requested by the UNFCCC to be made to input parameters in the cash flow calculations ("Afam PDD cash flow v25\_NOTES ADDED") , the project IRR of the project activity with CDM revenues has been estimated to be 16.8% (see workbook "Afam PDD cash flow v25\_NOTES ADDED"). It can be seen that whilst the difference between the project without CERs' IRR value (15.8%) and the hurdle rate (17%) of 1.2% is still much alleviated, it is not alleviated to the same level as was expected at the time of investment decision-making.

\\mathsf{E F}\_{\\mathsf{B L,C02,y}}

0.511\\mathrm{~t C O\_2/M M h}

Prior consideration of CDM

Because the starting date of the project activity is before the date of validation, evidence about the management decision considering CDM benefits is necessary. The project participants are requested to provide appropriate evidence for the serious consideration of the CDM prior to the decision to proceed with the project activity (in accordance with CDM-EB/16) for the following:

a) serious consideration of the CDM in the decision to proceed with the project activity, and

a) Serious consideration of the CDM in the decision to proceed with the project activity

The official, documented evidence for this is as follows:

- SPDC commissioned a study in 2003 to determine the overall benefits in terms of emissions that the development of the Afam Power Project would bring

- On 4 November 2003, Bent Svensson from the World Bank Secretariat for the Global Gas Flaring Reduction (GGFR) Public-Private Partnership wrote to GGFR participants, including Shell as part of a survey of potential CDM projects in the development pipeline

- On 17 November 2003, Jan Hartog from Shell replied to Bent Svensson, mentioning that the Afam project was under consideration as a CDM project.

- On 26 February 2004, David Mortimer, Governance Manager, Nigeria for Shell International Gas Limited, wrote to his Shell Nigeria colleague Noble Pepple that 'As you are aware there is considerable interest in G&P \[Shell Gas and Power\] in supporting initiatives on flaring reduction and the reduction of GHG emissions, with particular interest focussed on Nigeria. Shell has been in dialogue with the World


$ ^{34} $ Originally, off-grid generators combusting diesel were assumed to be the baseline, hence the higher estimate for emission reductions at the time of FID in Q4 2005.

35 This price is the primary weighted average CER price for 2005 as recorded in State and Trends of the Carbon Market, World Bank 2006.

* * *

Bank on these issues, and is seeking to promote: ... b) demonstration projects that might qualify for carbon credits. It was suggested that Afam might be a suitable candidate for the latter.'

- On the 25 October 2004, a letter was sent from Shell to the World Bank requesting that Afam be considered as a candidate CDM project. The letter notes that although informal discussions had taken place between joint venture partners concerning submission of the project, this was only to be considered formally at a joint venture board meeting of 29 October 2004. The letter also confirms that FID for the project was expected in 2005.

- By early 2005, Shell/SPDC had formally requested assistance in the preparation of an application for carbon credits under the CDM for the Afam gas-to-power project and the World Bank GGFR Secretariat called for Expressions of Interest.

- On 21 May 2005, a consulting team led by ECA was among the firms that submitted an Expression of Interest to the World Bank (which hosts the GGFR Secretariat).

- On 25 July 2005, the ECA-led team was one of five invited to submit a proposal.

- A PIN was submitted to the Nigerian DNA, who issued the Afam project a Letter of Endorsement (LOE) in August 2008.


b) Indication that continuing and real actions were taken to secure CDM status.

- The ECA team was awarded the contract by the GGFR, which formally commenced on 9 December 2005.

- From the outset of the study, Shell/SPDC made it clear that the decision to build a CCGT plant only made sense in light of emission reduction considerations, due to the economics of gas and electricity in Nigeria. (As confirmed in the additionality analysis in this document).

- During the course of the work, it became clear that the majority of the emission reduction benefits would arise from the decision to build a CCGT instead of an OCGT power plant. It also became clear that additional benefits would arise from the displacement of customers' own generation (which is universally from small and medium-sized diesel engines in Nigeria).

- ECA advised that the methodology for quantifying the emission reductions from displacing numerous, inefficient, high emission small generation engines would be very challenging, compared with the much more straight-forward baseline based on the open cycle alternative. Nevertheless, considering the size of the capacity deficit in Nigeria (and other African and developing countries), the proximate availability of natural gas, the high emissions that arise from this sub-optimal use of resources, and the significant economic burden on the Nigerian economy from high cost diesel generation and constrained electricity access for the poor, Shell/SPDC was keen to make a contribution to the state of the art with a ground-breaking CDM Methodology.

- The proposed new methodology passed internal review by SPDC on 29 January 2007.

- ECA was contracted by SPDC on 19 January 2007 in a follow-on assignment to prepare this as a new methodology together with a draft PDD for formal submission to the CDM EB.

- Validation review by the DOE was completed on 2 February 2007.

- On 19 March to 10 April 2007 the call for public input was open


* * *

- The Meth Panel internal desk review was completed on 12 April 2007

- SPDC responded to public comments on 4 May 2007

- The NM and PDD were considered at MP27 31 May to 1 June 2007

- On 5 Jun 2007, the proposed new methodology was posted online as NM0208

- On 30 June 2007, SPDC submitted its response to the Meth Panel comments as version 1.1

- At MP29 from 24 to 28 September 2007, NM0208 was reported as Work-in-Progress

- At MP 30 from 12 to 16 November 2007, NM0208 was not reported on

- At MP32 from 7 to 11 April 2008, NM0208 was reported on as Work-in-Progress

- At MP31 from 4 to 8 February 2008, NM0208 was reported on as Work-in-Progress

- At MP33 from 23 to 27 June 2008, NM0208 was not accepted (graded C) 'The Panel, in its discussion on the cases NM0208 and NM0246, acknowledges that the reality in many non-Annex I countries (particularly in Africa) is that grid electricity is often insufficient to meet electricity demand, and consumers use off-grid electricity in significant quantities to meet such unmet demand. The Panel requests the Board to take note that further work on this issue will be undertaken to develop methodological approaches to determine the conditions where construction of a grid-connected power plant can be deemed to partly or fully displace off-grid electricity, and to determine an emission factor in such cases.'

- On this basis, Shell/SPDC instructed ECA to proceed with a new PDD based on AM0029, using the simpler baseline of the open cycle plant investment alternative.

- At EB50 16 October 2009, 'The Board considered a revision to the "Tool to calculate the emission factor for an electricity system" in order to incorporate methodological approaches to estimate emission reductions for project activities that affect the operation of off-grid generation capacity. The Board agreed to approve the revision and further requested the Meth Panel to evaluate, based on feedback on its application in the projects, whether there is a need to enhance the usability and attractiveness of the tool for the project proponents.' The revised tool was provided in annex 14 to the EB50 report.

- A modification to the "Tool to calculate the emission factor for an electricity system" in version 2 incorporates much of the thinking originally developed in NM0208. However, it was decided to stay with the decision had already been taken to develop a new PDD based on AM0029, which is the present document.


The procedures used for calculating these emissions are described below:

B.6.1. Explanation of methodological choices

- Since July 2010, the project has been undergoing validation by DNV, with significant delays and hold ups, including one completeness check failure. This revised PDD addresses the incompleteness checks raised by the UNFCCC Secretariat. The PDD was made available for public comments over the period 16 July 2010 to 14 August 2010.

Version 05.0

* * *

The project activity is on-site combustion of natural gas to generate electricity. The $ \\mathrm{C O\_{2}} $ emissions from electricity generation （ $ P E\_{y} $ ）are calculated as follows:

\\mathrm{{C O\_{2}}}

(P E\_{y})

\\begin{array}{l}{{P E\_{y}=\\sum,F C\_{t,y},^{\\star}C O E F\_{t,y}}}\\end{array}

(1)

Where:

\\begin{array}{r l r}{F C\_{f,eta}}&{\ \ &\ \

(1a)

C O E F\_{t,y}\ !\

Where:

$ N C V\_{f,y} $ = the net calorific value (energy content) per volume unit of natural gas in year y （GJ/m $ ^{3} $ ）as determined from the fuel supplier, wherever possible otherwise from local or national data

y(G d/m^{3})

N C V\_{t,y}

E bar F{}\_{C O2,t,y}

{\\mathrm{c O}}\_{2}

(\\dagger{(}0{)}O{{(G))}}

$ O X I D\_{f} $ = the oxidation factor of natural gas (as per the 2006 IPCC Guidelines for National Greenhouse Gas Inventories)

O X l D\_{t}

\\langle\\bar{E F}\_{B L,C O2,y}\\rangle

(2)

The methodology requires project participants to use for $ E F\_{B L}, C O 2, y $ the lowest emission factor among the following three options:

- Option 1 - The build margin (BM) as per the "Tool to calculate the emission factor for an electricity system";

- Option 3 - The emission factor of the technology (and fuel) identified as the most likely baseline scenario, and calculated as follows:


(3)

Where:

Version 05.0

* * *

$ COEF\_{BL} $ = the fuel emission coefficient (tCO $ \_{2} $ e/GJ), based on national average fuel data, if available, otherwise IPCC defaults can be used

(\\mathsf C C O\_{2}e/G J)

$ \\eta\_{B L} $ = the energy efficiency of the technology, as estimated in the baseline scenario analysis above

The analysis presented below for two of the three options - namely the BM and CM includes both of the following:

- Grid connected only, and

- Grid connected plus off grid power generation


The latter is included as it is relevant in the context of Nigeria, but is not used to determine the baseline emissions when assessing the most conservative approach because the data does not meet the requirements set out in Annex 2 of the "Tool to calculate the emission factor in an electricity system" v2.2.1, as described in greater detail below.

On this basis the approach taken assumes the following:

- That the relevant electricity system is the Nigerian power grid (not including, and including, off grid power plants) - Step 1 in the "Tool to calculate the emission factor in an electricity system" v2.2.1

- That an analysis of off-grid power generation is also included for illustrative purposes therefore Option II in Step 2 of the "Tool to calculate the emission factor in an electricity system" v2.2.1 is followed.


The key reason for including off grid generation in the analysis is its very high significance for the Nigerian power sector, and it therefore makes a useful illustrative example of applying the off-grid methodology. NEPA estimates suggest that off-grid generation constitutes about 50% of installed generation capacity (see next section). The importance of off grid generation and its economic and social costs was most recently acknowledged in the Roadmap for power sector reform study undertaken by the Presidential Task Force on Power $ ^{36} $ . The importance of off-grid diesel generation in Nigeria was also most recently highlighted in a World Bank report stating that

Poor service has forced more than 90 percent of industrial customers and significant numbers of residential consumers to install their own power generators, at a high cost to themselves and the Nigerian economy. $ ^{37} $

Ignoring off grid generation in this analysis results in inaccurate results by disregarding a considerable proportion (according to some estimates even the majority) of generation capacity in Nigeria. However, the only comprehensive and robust survey data on off grid power generation in Nigeria is the Triple E Consultants report, dated 2003 (op.cit.). Due to the delays in developing this project activity under the CDM (see page 30, Prior Consideration of CDM), this data is not of suitable vintage and quality to meet the requirements laid out in Annex 2 of the "Tool to calculate the emission factor of an electricity system" v2.2.1, in particular the following:

$ ^{36} $ available at [http://www.nigeriapowerreform.org/downloads/](http://www.nigeriapowerreform.org/downloads/)

$ ^{37} $ World Bank Report 32 164-NG, p28.

* * *

CDM-PDD-FORM

- Quality: data requirements in relation to Table 1 of Annex 2 are not contained in the Triple E survey results.

Moreover, undertaking a renewed survey of off-grid generators was not considered to be economically feasible for the purpose of this CDM-PDD. This is because in applying AM0029, the most conservative baseline emission factor must be selected to calculate the baseline emissions, and including off-grid diesel generator sets would necessarily result in a less conservative baseline than one in which they not included (i.e. in Nigeria, the dominant fuel in grid-connected power is natural gas and hydropower, both of which are less carbon-intensive than diesel fuel, the fuel of choice for off-grid power generation). To illustrate this point, however, we have included the emission factor calculation for both grid connected only and grid connected and off-grid power generation, working with what off grid data is available and using conservative assumptions as appropriate.

For the avoidance of doubt, the following sections of the PDD only take account of grid connected power generation when selecting the most conservative baseline emission factor for use in the project baseline calculation.

The most recent year selected was 2009, based on the date when the PDD was originally submitted for validation (see Prior Consideration of CDM for clarification of delays).

Option 1-The Build Margin

There is a very large generation capacity deficit on the Nigerian electricity grid. This means that there are no 'marginal plants' on the grid, as all existing grid-connected plants must operate for all of their available hours to meet demand. To support this assumption, official statistics show that the installed on-grid capacity in Nigeria has not increased since 1987, excluding those covered by CDM project activities such as the Okpai IPP described previously. Officially, there is 4.5 GW of generation capacity supplying the grid. In practice, at any one time much of this capacity is unavailable due to poor maintenance or complete lack of maintenance of generation infrastructure, lack of replacement parts, or breakdown due to incorrect operation. In addition to these problems, the hydro capacity can be affected by seasonal or other shortages of water, reducing the effective available capacity. The combination of the above factors can reduce the available capacity on the grid by one third to one half.

The shortfall in generation capacity in Nigeria is met by off-grid diesel generators used by businesses and households $ ^{38} $ . NEPA collected data from 1974 to 2002 on the capacity (in kVA) of new off-grid generators on residential and non-residential (commercial/industrial) customers' sites. New capacity installed each year increased from several hundred kVA per year in the mid-1970s to over 500 MVA by 2002. The stock of installed generation capacity has been calculated from the data on new units installed each year by a simple stock model, and the assumptions that each unit has a service life of 15 years with a power factor of $ 0.85^{39}. $ The two independent sources of NEPA and Triple E indicate that at the end of 2005 there was about 4,500 MW of off-grid generation capacity in Nigeria: 900 MW among residential customers and 3,600 MW supplying commercial and industrial sites. The historical trend of installed capacity since 1970 is shown in Figure 6.

$ ^{38} $ World Bank Report 32 164-NG, p28

$ ^{39} $ i.e. each kVA of capacity generates 0.85 kW of active power

* * *

Figure 1: Current and historical on-grid and off-grid generation capacity in Nigeria $ ^{40} $

The data in Figure 1 also show that the Afam VI plant output (650 MW) is smaller than the capacity deficit (i.e. the difference between the total recorded capacity of around 9 GW and the grid connected capacity of around 4.5GW) and therefore will not have any displacement effect on other power plants connected to the grid. Thus, if power from the Afam plant has the effect of reinforcing the Nigerian power grid, it will likely displace electricity produced by auto-generators who, whilst having a grid connection, elect not to connect to use grid electricity because it is too unreliable. On this basis, it is reasonable to assume that the build margin for power plants in Nigeria is off-grid diesel generators.

Following the methodology set out in Step 6 of the "Tool to calculate the emission factor for an electricity system" v.2.2.1, the build margin is calculated by:

\\mathsf{B M C O\_{2}}

E\\check{G\_{m,y}}

(4)

E bar F{{}}\_L E,,,y,

$ E F\_{EL,m,y} $ = $ \\mathrm{C O}\_{2} $ emission factor of all power units with energy source m in year 2009 (tCO $ \_{2} $ /MWh)

40 Triple "E". 2005 Baseline GHG Emission Reduction Estimate for the Proposed Afam Power Rehabilitation Project Study conducted for Shell Petroleum Development Company of Nigeria, April.

* * *

CDM-PDD-FORM

In the approach presented, Option 1 in Step 5 of the "Tool to calculate the emission factor for an electricity system v.2.2.1" i.e. an ex ante approach to determining the BM, is taken. The approach presented includes both grid-connected only power plants, and grid connected plus off grid power plants.

Determination of emissions factor for BM using grid-connected and off-grid power plants

The data used in the illustrative calculation is based on option (b) of Step 1 in Annex 2, i.e. a statistical evaluation of the data based on sampling. This is mainly due the fact, as highlighted previously, that only very limited data on off-grid production is available and conducting a full survey of generators in the domestic and commercial sectors is not realistically achievable over the available time horizon.

Table 12: Step by step approach for off-grid data collection below provides a summary of the off-grid plant for the data collected in the survey in accordance with Annex 2 of the "Tool to calculate the emission factor for an electricity system v.2.2.1". Most of the data in Table 12: Step by step approach for off-grid data collection is based on one of two sources $ ^{41} $ including a firm survey of 232 firms in Nigeria operating off-grid generation facilities.

Table 12: Step by step approach for off grid data collection

| Step |  | Residential | Non-Residential |
| --- | --- | --- | --- |
| 1 |  | Statistical evaluation of the data based on sampling |  |
| 1.1 | Capacity(MW)42 | 900(overall) | 3,600(overall) |
|  | Technology | Reciprocating Engine | Reciprocating Engine |
|  | Fuel | Diesel | Diesel |
|  | Grid | True | True |
|  | Switch | True | True |
| 1.2 | Classification | Diesel | Diesel |
| 1.3 | Sectors | Residential | Non-Residential |
| 1.4 | Survey design | n.a. | n.a. |
| 2 | Exclude plants | n.a.因为based on sample | n.a.因为based on sample |
| 3 | Aggregate data | By using 900MW和3,600MW respectively，extrapolation of data on all off grid generation |  |
| 4 | Extent of off grid power | off grid capacity~50%of total capacity(see previous section)和therefore considerably higher than required10% |  |
| 5 | Reliability of grid | Shortage of generation is key reason for unmet demand and black-outs.This is mainly due to poor maintenance of generation plants rather than transmission and distribution networks。43 |  |

In determining the BM including the off-grid power plants, the first step is determine the tranches of plants of different vintage to be included in the BM analysis. Firstly, in order to fill

$ ^{42} $ NEPA, Triple E

43 Federal Presidency of Nigeria (2010) Roadmap for Power Sector Reform. August 2010. pg.64 in the gap between 2002 (the year the survey took place) and 2009 (the year selected for baseline determination, the most recent year for which data is available prior to validation), an extrapolation is made based on published estimates of installed capacity (around 6,000 MW in 2009). This provided estimates of installed capacity for off-grid power plants in the various tranches described in Step 1.2 of Annex 2 of the "Tool to calculate the emission factor for an electricity system v.2.2.1" as follows (Table 13).

Table 13: Tranches/vintages of off grid power plants used in the analysis

|  | MW | MWh\* |
| --- | --- | --- |
| Plants up to 5 years old | 750 | 224975 |
| Plants>5<10 years old | 1400 | 420142 |
| Plants>10 years old | 3850 | 1154883 |
|  | 6000 | 1800000 |

- In 2009; electricity generation of each off grid tranche has been estimated based on using the default parameters set out in "Tool to calculate the emissions factor of an electricity system v.2.2.1"

These tranches are then included alongside the grid connected power plants in a systems analysis of the BM as follows (Table 14).

Table 14: Grid and off-grid power plants used to determine build margin emission factor $ \\left( E F\_{B L, C O2} \\right) $

(\\mathsf{E F}\_{\\mathsf{B L},\\mathsf{C O02}})

| Power plant | Installed Capacity of Power Plants (MW) | Electricity generation(MWh) in 2009 | Year of Commissioning |
| --- | --- | --- | --- |
| NESCO\* | - | - | - |
| AGGREKO | - | - | - |
| GEOMETRIC | - | - | - |
| CALABAR | - | - | 1934 |
| AFAM | 931.6 | 151,048 | 1963-2001 |
| DELTA | 882 | 1,591,573 | 1966 |
| KAINJI | 760 | 2,505,663 | 1968 |
| SAPELE | 1020 | 121,269 | 1978 |
| JEBBA | 578.4 | 2,676,860 | 1985 |
| EGBIN | 1320 | 3,383,990 | 1986 |
| SHIRORO | 600 | 2,282,117 | 1989 |
| AES | 302 | 1,681,451 | 2001 |
| OFF GRID(>5<10YEARS) | 1,400 | 420,142 | 2000-2004 |
| OKPAI\* | 450 | 3,079,384 | 2005 |
| AJAOKUTA | 110 | - | 2006 |
| OMOKU | 100 | 422,355 | 2006 |
| OMOTOSHO | 335 | 383,266 | 2007 |
| GEREGU | 414 | 378,603 | 2007 |
| OLORUNSOGO | 335 | 103,591 | 2007 |
| OFF GRID(<5YEARS) | 750 | 224,975 | 2005-2009 |
| IBOM | 37 | 3,204 | 2009 |

Version 05.0

* * *

\*NOTE: Data from NESCO is excluded as it is on an isolated grid. Okpai power plant is a registered CDM project

Following the procedure set out in Step 5 of the "Tool to calculate the emission factor for an electricity system" v.2.2.1, and the data presented in Table 14 the BM has been selected based on the sample $ \\mathbf{SET}\_{\\geq 20%} $ as outlined below.

| AEGtotal(MWh) | 16,330,107 |
| --- | --- |
| AEGSET-5-units(MWh) | 1,093,639 |
| AEGSET->20%(MWh) | 3,617,587 |
| AEGSET->20%/AEGtotal | 22% |
| AEGSET->20%(MWh)>AEGSET-5-units(MWh), therefore |  |
| SETsample(MWh)=AEGSET->20% | 3,617,587 |

\\mathsf{S E T}\_{\\geq20%}

A E G\_{t o t a l}(M M h)

A E G\_{S E T\\geq20%}/A E G\_{t O t a1

\\tt{S E T}\_{\\tt s}a p m l e\ (W h)=A E G\ \_{\\tt S E T>-2000}

Using the SET $ _{SAMPLE} $ (i.e. $ SET_{\\geq 20%} $ ) the two components in equation (4) are used to calculate the BM $ _{EF} $ as outlined below (Table 15). In determining the emission factor for off-grid diesel generation （ $ EF_{EL,m,y} $ ） presented in Table 15, the guidance in Step 4 (a) Option A2 of the "Tool to calculate the emission factor for an electricity system" v2.2.1 is employed using the following inputs:

\\sf{S E T} _{S A M P L E}(i.e.S E T_{z200})

\\mathsf{B M}\_{\\mathsf{E F}}

(E\\bar{F}\_{E L,m,y})

\\begin{array}{r l r}{E F\_{C C e,m,y}}&{{}\ \\\ =\ \\\ 0.744\ \\mathrm{C C O\_{2}!G/G!\ ((I P P C C\ d o f t a m t\ e m i s s i o n\ f a c t o r\ f o r\ c l e e e e\ i i)}}\\end{array}

$ \\eta\_{m,y} $ Default values are employed as provided in Annex I of the "Tool to calculate the emission factor for an electricity system" v2.2.1, based on the following average capacities for different types of off grid power plants:

33.0% based on the average capacity of residential off-grid power plants in the Lagos area using sample data, $ ^{44} $ derived as 30.4 kW (22,710 kW total capacity/746 plants) 37% based on the average capacity of commercial off-grid power plants in the Lagos area using sample data, derived as 121.3 kW (10,067 kW total capacity/83 plants) 42% based on the average capacity of industrial off-grid power plants in the Lagos area using sample data, derived as 905.0 kW (325,782 kW total capacity/360 plants)

The workings used to calculate the average capacity of off-grid power plants in the Lagos area is shown in sheet "off grid 2" in Excel workbook "Afam PDD Baseline EF calculations v2.3\_corrected", whilst the derivation of the $ E F\_{CO2,m,y} $ for the various tranches of off-grid power plants is shown in sheet "off grid 3" in the same workbook.

2^{\\circ}

For the calculation of $ E G\_{m,y} $ in equation (4) Option 3 in Step 4 of the "Tool to calculate the emission factor for an electricity system" v2.2.1 is applied.Because of the lack of appropriate data, the conservative estimate of 300 hours of off grid operation per year is chosen.Using

E G\_{m,y}

{mathfrak e}^{\\circ}!{\\mathfrak E}^{\\circ}.!

44 Triple "E". 2005 Baseline GHG Emission Reduction Estimate for the Proposed Afam Power Rehabilitation Project Study conducted for Shell Petroleum Development Company of Nigeria, April.

* * *

these parameters in equation (4) results in a value for the off-grid $ E F\_{B L, C O 2} $ of 0.673 tCO $\_2$/MWh (see sheet "off grid 3" in Excel workbook "Afam PDD Baseline EF calculations v2.3\_corrected", as shown below (Table 15).

\\bar{E}\\bar{F}\_{B L,C O2}

3^{\\circ}

* * *

Table 15: Determination of BM emissions factor $ \\left( E F\_{\\mathrm{grid},\\mathrm{BM} y}\\right) $ for grid and off-grid power plants

(mathsf\\mathsf{E F}\_{\\mathsf{g r i d,,B,A,,,,,,,,,,,,,,,},},}

| Power plant(m power units) | Gas consumed(2009) | Electricity(2009) | Plant type | EF(el,m,y) |
| --- | --- | --- | --- | --- |
| MMSCF | MWh | - | tCO2/MWh |  |
| AES | 21,946 | 1,681,451 | OCGT | 0.73 |
| OFF GRID(>5<10YEARS) | NA | 420,142 | OFF-GRIDDIESEL | 0.67 |
| AJAOKUTA | NA | 0 | OCGT | 0.51 |
| OMOKU | NA | 422,355 | CCGT | 0.34 |
| OMOTOSHO | 4,279 | 383,266 | OCGT | 0.62 |
| GEREGU | 5,071 | 378,603 | CCGT | 0.74 |
| OLORUNSGO | 940 | 103,591 | OCGT | 0.50 |
| OFF GRID(<5YEARS) | NA | 224,975 | OFF-GRIDDIESEL | 0.67 |
| IBOM | NA | 3,204 | OCGT | 0.51 |
| TOTAL | - | 3,617,587 | - | - |

\\mathsf{E F}\_{(\\mathsf{e l},\\mathsf{m},\\mathsf{y})}

H C O\_{2}/N N N

NOTE: Not all grid-connected power plant have gas consumption data available, and therefore default values using the "Tool to calculate the emission factor for an electricity system" v.2.2.1 have been employed. See below.

| $\\sum\\mathrm{EG} _{\\mathrm{m,y}}\*\\mathrm{EF}_{\\mathrm{EL,m,y}}=$ | 2,217,788 |
| --- | --- |
| $\\sum\\mathrm{EG}\_{\\mathrm{m,y}}=$ | 3,617,587 |
| $\\mathrm{EF}\_{\\mathrm{grid,BM,y}}=$ | 0.6131 |
| $\\mathrm{EF}\_{\\mathrm{grid,BM,y}}=$ | 0.613 |

\\sum\\mathsf{E G} _{\\mathsf{m},mathsf y\\^star,\\mathsf{E}\\mathsf{F}_{\\mathsf{E L},\\mathsf{m},\\mathsf{y}}}=

\\underline{{\\sum E G\_{m,y}=}}

\\tt{E F\_{q r i d,B M,y}}=

\\underline{{t C}}O{{}\_ _{{2}}}/M N{{\ {}}{{}{(N}_{{N}} _{{}{{N}}_{{}} _{{}}{{N}}_{{}} _{{}}_{{}}} _{{{}}_{{}}} _{{{}}_{{}}} _{{{}}_{{}}} _{{{}}_{{}}} _{{{}}_{{}}} _{{{}}_{{}}} _{{{}}_{{}}} _{{{}}_{{}}} _{{{}}_{{}}} _{{{}}_{{}}} _{{{}}_{{}}} _{{{}}_{{}}} _{{{}}_{{}}} _{{{}}_{{{}} _{{}}}_{{{}} _{{}}}_{{{}} _{{}}}_{{{}} _{{}}}_{{{}} _{{}}}_{{{}} _{{{}}_{{}}} _{{{}}_{{}}} _{{{}}_{{{}} _{{}}}_{{{}} _{{}}}_{{{}} _{{}}}_{{{}} _{{}}}_{{{}} _{{}}}_{{{}} _{{{}}_{{}}} _{{{}}_{{}}} _{{{}}_{{}}} _{{{}}_{{}}} _{{{}}_{{}}} _{{{}}_{{}}} _{{{}}_{{}}} _{{{}}_{{}}} _{{{}}_{{}}}\_

As shown above, the emission factor for grid connected plus off grid power plants results in the a value of $ E F\_{B L,C O\_{2}} $ of 0.613 tCO $ \_{2} / $ MWh (see sheet "INCL OFF GRID Option 1" in workbook "Afam PDD Baseline EF calculations v2.3\_corrected")

1^{\ }}

\\bar{E}\\bar{F}\_{B L,C O2}

0.613\ t C O\_{2}/M W h

Determination of emissions factor for BM using grid-connected power plants only

As required by the approach taken, the emissions factor $ E F\_{B L,C O 2} $ for only grid connected power plants in Nigeria has also been calculated. This was undertaken using the most recent data available at the time of validation, namely 2009 power generation data. This included information provided the Osogbo National Control Centre (NCC) operated by the Power Holding Company of Nigeria （PHCN） $ ^{45} $ , plus additional information on the specific gas consumption at the Okpai IPP, which is owned and operated by Agip Nigeria (IPP data on gas consumption are not provided by NCC Osogbo). These data are shown in Table 14 above, which have been used as the basis for determining $ E F\_{B L,C O 2} $ for grid-connected power plants (i.e. excluding the off grid tranches shown in Table 14). The full description of the steps and data are presented the sheet "GRID ONLY Option 1" in the Excel workbook "Afam PDD Baseline EF calculations v2.3\_corrected".

1^{\ }}

45 PHCN (2010) Generation and Transmission Grid Operations 2009. National Control Centre Osogbo, Annual Technical Report. Osogbo, Nigeria.

* * *

In accordance with the "Tool to calculate the emission factor for an electricity system" v2.2.1 determination of the relevant sample set used to calculate the build margin is applied as follows (Table 16).

Table 16: Determination of BM sample set (using grid connected power plants shown in Table 14)

| AEGtotal(MWh) | 15,684,990 |
| --- | --- |
| AEGSET-5-units(MWh) | 1,291,019 |
| AEGSET->20%(MWh) | 5,254,587 |
| AEGSET->20%/AEGtotal | 34% |
| AEGSET->20%(MWh)>AEGSET-5-units(MWh),therefore | - |
| SETsample(MWh)= | 5,254,587 |
| SETsample(MWh) excluding units>10 years old | 2,972,470 |
| SETsample(MWh) excluding units>10 years old/AEGtotal | 19% |
| SETsample(MWh) excluding units>10 years old,including1stCDMproject/AEGtotal | 39% |
| AEGSET-Sample-CDM(MWh) | 6,051,854 |
| AEGSET-Sample-CDM/AEGtotal | 39% |

A E G\_{t o t a l}(M M h)

A E G\_{S E T-\\min s s}(M M h)

A E G\_{S E T\\rightarrow200%}(M M h)

A E G\_{S E T\\geq20%}/A E G\_{100l}}

\\underline{{\\mathsf{S E T}}}\_{\\mathtt{s a m p l e}},(\\mathrm{M M h})=

\\underline{{\\mathsf{A E G}}}\_{\ \ t o t a l}

\ E\ G\_{S E T\ S a m o l e\_D M}(M M h)

\\underline{{\\mathsf{A E G}\_{\\dagger0t a l!}}}

On the basis of the analysis shown above (Table 16), the SET $ \_{sample-CDM} $ is derived as follows:

{\\tt S E T}\_{\\tt s a m p l e-C D M}

1. AEG $ \_{SET\\geq 20%} $ excluding Okpai (as a CDM project) comprises a larger annual generation than AEG $ \_{SET-5-units}. $ Therefore, SET $ _{SAMPLE-CDM}=AEG_{SET\\geq 20%}; $

\\mathsf{A E G}\_{E E!2\ \ 0%}

\\uparrow\\mathsf{A E G}\_{\\mathsf{S E T-5u i t s}}

\\dot{;},\\dot{\\mathsf{S E T} _{S A M P L E\ C O M}}=\\hat{\\mathsf{A E G_{S E E\\geq2000}}},

2. AEG $ \_{SET\\geq 20%} $ includes plants older than 10 years old, and therefore Okpai IPP is included. This covers 39% of total generation and therefore AEG $ \_{SET\\geq 20%} $ - Shiroro (older than 10 years) + Okpai = SET $ \_{sample-CDM}, $

| Power plant(m power units) | Gas consumed(2009) | Electricity(2009) | Plant type | EF(el,m,y) |
| --- | --- | --- | --- | --- |
| MMSCF | MWh | - | tCO2/MWh |  |
| AES | 21,946 | 1,681,451 | OCGT | 0.73 |
| OKPAI | 21,674 | 3,079,384 | CCGT | 0.39 |
| AJAOKUTA | NA | 0 | OCGT | 0.51 |
| OMOKU | NA | 422,355 | CCGT | 0.34 |
| OMOTOSHO | 4,279 | 383,266 | OCGT | 0.62 |

:A A G\_{S E T\\geq20%}-S\\sin1100%

\\mathsf{E F}\_{(\\mathsf{e l},\\mathsf{m},\\mathsf{y})}

17: Analysis of sample set to determine build margin emission factor of grid- connected power plants $ \\mathrm{E F\_{grid}, B M, y} $

The EF $ \_{grid,BM,y} $ for the SET $ \_{SAMPLE-CDM} $ is derived as follows (Table 17).

\ mathsf S S E\_{\\mathsf S{M P M L E-C D M}}

\\mathsf{E F}\_{\\mathsf{g r i d,B M,y}}

* * *

| GEREGU | 5,071 |  |
| --- | --- | --- |
| OLORUNSGO | 940 |  |
| IBOM | NA |  |
| TOTAL | - |  |

| 378,603 | CCGT | 0.74 |
| --- | --- | --- |
| 103,591 | OCGT | 0.50 |
| 3,204 | OCGT | 0.51 |
| 6,051,854 | - | - |

NOTE: $ E F\_{E L,m,v} $ data shown in red text is derived using default efficiency values from Annex I of the "Annex I of the "Tool to calculate the emission factor for an electricity system" v2.2.1. This is because these plant are IPPs, and do not provide gas consumption data to the NCC Osogbo, with the exception of Okpai.

\\overline{{\\mathsf{E F}\_{\\mathsf{E L}\\mathsf{m},\\mathsf{V}}}},

| $∑EG\_{m,y}\*EF\_{EL,m,y}= | 3,139,460 |
| --- | --- |
| ∑EG\_{m,y}= | 6,051,854 |
| EF\_{grid,BM,y}= | 0.5188 |
| EF\_{grid,BM,y}= | 0.519 tCO\_{2}$ |

\\sum\\mathsf{E G} _{\\mathsf{m},\\mathsf{y}},^{\\star},\\mathsf{E F}_{\\mathsf{E L},\\mathsf{m},\\mathsf{y}},=

\\underline{{\\sum E G\_{m,y}=}}

\ tt E{sf F}\_{q r i d,B M,y}=

\ {sf E E F\_{q r i d,B M y}}=

\ {t C O\_{2}}M W

As outlined above, excluding the off grid power generation form the BM emission factor calculation results in a value of $ E F\_{B L,C O\_{2}} $ of 0.519 tCO $ \_{2} $ /MWh. This is the value used for Option 1 (see sheet "GRID ONLY Option 1" in Excel workbook "Afam PDD Baseline EF calculations v2.3\_corrected").

E F\_{B L,C O2}

\ {tt t t}c c\_{2}/M W h

1^{\ }}

The full workings for analysis outlined in Tables 16 and 17 is shown in sheet "GRID ONLY Option 1" and "Power plant data and assumptions" in the Excel workbook "Afam PDD Baseline EF calculations v2.3\_corrected".

1^{\ }!{{mathrmmathrm{{}}}}

Option 2-The Combined Margin

Introduction

The combined margin is calculated from the build margin and the operating margin. Equal weight is applied to the two factors as stipulated by the "Tool to calculate the emission factor for an electricity system" v2.2.1. Since the build margin emission factor （ $ B M\_{E F} $ ）has already been calculated in the previous option (Option 1), this section will outline the calculation of the operating margin only. It will therefore describe the applied data and chosen methodology from Steps 3 and 4 of the "Tool to calculate the emission factor for an electricity system" v2.2.1.

(\\mathsf{B M}\_{\\mathsf{E F}})

1. A simple OM analysis is employed - Step 3 of the "Tool to calculate the emission factor for an electricity system" v2.2.1; This approach is allowable as the only low cost/must run resource applicable to the Nigerian power markets is electricity generated from hydro power sources, and its share of total electricity generation capacity constituted $ 32 %^{46} $ of total grid connected generation over the period 2005- 2009; this is below the critical threshold of 50% (see sheet "Power plant data & assumptions" in Excel workbook "Afam PDD Baseline EF calculations v2.3\_corrected").

The following approach is taken in determining the emission factor for the OM:

46 See Excel workbook "Afam PDD Baseline EF calculation v2.3\_corrected"; the data sources used therein are the Annual Technical Reports from the NCC Osogbo, PHCN (2006-2010). Total hydro power generation over the period 2005-2009 = 34,746,743 MWh, from a total grid connected generation of 110,495,790 MWh over the period.

* * *

1. An ex ante option is taken to calculating the emission factor - Step 3 of the "Tool to calculate the emission factor for an electricity system" v2.2.1;

2. Option A (Calculation based on average efficiency and electricity generation of each plant) is adopted - Step 4 (a) Simple OM of the "Tool to calculate the emission factor for an electricity system" v2.2.1;

3. A combination of Option A1 and Option A2 is employed to determine the $ \\mathrm{CO\_{2}} $ emission factor for each plant （ $ EF\_{EL,m,y} $ ）. Option A2 is employed for some plants because gas consumption data was not available for all IPPs (only Okpai); this data is not collected routinely by NCC Osogbo - Step 4 of the "Tool to calculate the emission factor for an electricity system" v2.2.1


\\mathrm{C O\_{2}}

(E\\bar{F}\_{E L,m,y})

Following on from the approach used for the BM, this is undertaken covering both:

- Grid connected plus off grid power plants as an illustrative method; and
- Grid connected power plants only.

For grid connect power plants, data from the PHCN annual reports provided by the Osogbo NCC have been used for the basis of calculating the generation, which - when applying the last 5 years of data available at the time of validation - covers the period 2005-2009. As required in taking an ex ante approach to the determination of power plant emissions, three years of power generation data have been used (2007-2009) to determine the weighted average of power generation.

For off-grid power plants, data from the Lagos area survey of off-grid power generation (Triple 'E' Consultants, 2005, op. cit) has been used as the basis for determining the simple OM analysis including both grid-connected plus off-grid power plants.

\\dot{\\mathrm{E}}

Application of Option A requires the following method to be used to calculate the OM emission factor:

\\begin{array}{r}{E\ \\hat{F} _{g n d,,O M s i m p l e,y}\ =\\big(\\sum E\\hat{G}_{m,y},\\star^{\ },E\\hat{F} _{E L,m,y}\\big),/\\sum E\\hat{{}G}_{m,y}}\\end{array}

(5)

Where,

\\begin{array}{r l}{E F\_{g\\mathrm{g t t, ~~C o t i n n a a r~~}}}&{=\\mathrm{~~ S i m p l o ~~C M~~ C C\_\_2}e m i a s i o n ~~f a c t o r~~ b a s e e d ~~o n~~ 3\ \\mathrm{y ~~e r r~~}w e i g p t e d ~~o v r e e e99~~ a n i n e r}\ &{\\quad\\mathrm{ ~~o x~~ a n t o ~~a n t r a m i a a t~~ n p p t i o n, ~~a p t r e200,2~~ 070~~r2209~\ (0C0\_0000)}}\\end{array}

\\begin{array}{r l r}{\\mathsf{E G}\_{n y,y}}&{\\qquad}&{=\\mathrm{\ N a t ~~q u a r t i y~~ o f ~~s e e c t i c i y~~ g e n t e d t ~~n d~~ e l l v e r e d ~~t o~~ i h e ~~g i i d~~ b y ~~a l l}}\ &{}&{\\mathrm{\ p p o m e t~~ u n i t y ~~d i i t~~ e n e t t y ~~s o u t e~~ m o n~}gamma\ \ {sf N N N}}\\end{array}

Determination of emissions factor for OM using grid-connected and off-grid power plant

EF $ \_{EL,m,y} $ is calculated by applying a combination of Option A1 (for PHCN plants for which fuel consumption data is available) and Option A2 (for IPP plants which do not publish fuel consumption data); see sheet "GRID ONLY Option 2" in Excel workbook "Afam PDD Baseline EF calculations v2.3\_corrected";

=\\mathtt{a l l\ e n o r g y\ s o u r c e s\ s e r v v i n g\ t h e\ g r i d\ e x c e p t\ t h h\ m u u t\ r u u\ h y d r o\ p l i n t t s}

2^{\ }!

E bar F{{}}\_{E L,m,y}

* * *

Table 18: Calculation of Operating Margin Emission Factor 2007-2009 (grid and off-grid)

| Plant name | Plant emissions(tCO2)(FCi,m,y _NCVi,y_ EFCO2,i,y) |  |  |  | Elec generation(MWh) | Emission factor(tCO2/MWh) | EGm,y\*EFEL,m,y |
| --- | --- | --- | --- | --- | --- | --- | --- |
| 2007 | 2008 | 2009 | 3-year average | EGm,y | EFEL,m,y |  |  |
| KAINJI | - | - | - | - | - | - | - |
| JEBBA | - | - | - | - | - | - | - |
| SHIRORO | - | - | - | - | - | - | - |
| NESCO$\\cdot$ | - | - | - | - | - | - | - |
| OFF GRID(>10YRS) | - | - | - | - | 1,154,883 | 0.673 | 776,983 |
| EGBIN | 1,978,264 | 2,660,261 | 1,308,084 | 1,982,203 | 3,800,745 | 0.522 | 1,982,203 |
| SAPELE | 411,060 | 426,503 | 77,952 | 305,172 | 447,012 | 0.683 | 305,172 |
| AFAM | 996,570 | 263,891 | 126,427 | 462,296 | 579,141 | 0.798 | 462,296 |
| DELTA | 2,123,570 | 1,170,127 | 1,218,492 | 1,504,063 | 1,933,093 | 0.778 | 1,504,063 |
| AES | 1,150,728 | 1,329,177 | 1,219,489 | 1,233,131 | 1,734,550 | 0.711 | 1,233,131 |
| OFF GRID(>5<10YRS) |  |  |  |  | 420,142 | 0.673 | 282,663 |
| CALABAR | - | - | - | - | - | - | - |
| AGGREKO | - | - | - | - | - | - | - |
| GEO-METRIC | - | - | - | - | - | - | - |
| OKPAI | 1,252,675 | 1,120,756 | 1,204,335 | 1,192,588 | 3,027,421 | 0.394 | 1,192,588 |
| AJAOKUTA$\\cdot$ | 292,723 | 15,515 | - | 102,746 | 200,954 | 0.511 | 102,746 |
| OMOKU$\\cdot$ | 144,491 | 100,166 | 142,165 | 128,941 | 383,068 | 0.337 | 128,941 |
| OMOTOSHO | 77,386 | 306,060 | 237,795 | 207,080 | 340,640 | 0.608 | 207,080 |
| GEREGU | 588,640 | 637,675 | 281,792 | 502,702 | 856,010 | 0.587 | 502,702 |
| OLORUN-SOGO | - | 257,739 | 52,245 | 103,328 | 174,046 | 0.594 | 103,328 |
| OFF GRID(<5YRS) | - | - | - | - | 24,975 | 0.673 | 151,359 |
| IBOM$\\cdot$ | - | - | 1,078 | 359 | 1,068 | 0.337 | 359 |
| TOTAL | 9,016,108 | 8,287,869 | 5,869,855 | 7,724,611 | 15,277,746 | - | 8,935,616 |

(mathsf F C C\_{\\mathsf{i},\\mathsf{m},\\mathsf{y}},\\mathsf^{\\star},N C V\_{\\mathsf{i},\\mathsf{y}},^{\\star},E F\_{\\mathsf{C}02\\mathrm{,}\\mathsf{i},\\mathsf{y}})

\\mathsf{E G}\_{,,}

\\sf{E G\_{m,y}}^{\\star}

{mathsf\\mathsf E F\_{\\mathsf E L,\\mathsf m,\\mathsf y}}

\\mathsf{E F}\_{\\mathsf{E L},\\mathsf{m}\\,mathsf{y y}}

\*NOTE: For these IPP power plants, levels of fuel consumption are not published. Therefore, Option A2 in Option A in Step 4 of the "Tool to calculate the emission factor for an electricity system" is applied to these plants.

For off-grid power plants, $ EG\_{m,y} $ is calculated by following Option 3 and using the default value of 300 hours of operations of off grid plants as outlined in the tool for calculating emission factor for electricity production (see sheet "off grid 1" in Excel workbook "Afam PDD Baseline EF calculations v2.3\_corrected").

E G\_{m,y}

From the data presented above, $ E F\_{grid,OMsimple,y} $ is calculated using the data presented in Table 18 as follows:

1^{\ }!^{circ}

v2.3

| $\\sum EG\_{m,y} \\ast EF\_{EL,m,y}$ | 8,935,616 |
| --- | --- |
| $\\sum EG\_{m,y}$ | 15,277,746 |
| EFgrid,OMsimple,y | 0.585 |

\\sum\\mathsf{E G}\_{\\mathsf{m,y}}

\\textstyle\\sum\ {sf E E} _{\ {\\sf m},y}\ ^{\\star}{\\sf E F}_{{\\sf E L},{\\sf m},y}

* * *

In determining the emission factor for grid-connected only power plants, the same approach described previously and data as presented in Table 18 are used, with the exclusion of the off grid power plants from the analysis. This results in the following:

| $\\sum EG\_{m,y} \\ast EF\_{EL,m,y}$ | 7,724,611 |
| --- | --- |
| $\\sum EG\_{m,y}$ | 13,477,746 |
| EFgrid,OMsimple,y | 0.573 |

\\textstyle\\sum\ {sf E E}{{\\sf G}} _{{\ m},{y}}\ ^{\\star}{{\\sf E F}}_{{{\\sf E L}},{m},{y}}

\\sum E G\_{m,y}

The full calculations of the $ \\mathrm{O M\_{E F}} $ - using data provided by PHCN - are presented in sheet "GRID ONLY Option 2" in the Excel workbook "Afam PDD Baseline EF calculations v2.3\_corrected".

\ \\mathrm{O M}\_{\\mathsf{E F}}

2^{\ }}

Determination of emissions factor for CM using grid-connected and off-grid power plants

As previously mentioned the combined margin emission factor is simply the average of the operating margin emission factor and the build margin emission factor. Drawing on the analysis presented above, for grid connected and off-grid power plants, and the resulting value for $ E F\_{grid,CM,y} $ equals:

(\\mathsf{E F} _{\\mathsf{g e t B M M},\*},0.5)+\ (\\mathsf{E F}_{\\mathsf{g e t C M A m m a y}, _}0.5)=(0.613^{_}0.5)+(0.585^{\*}0.5)=0.599\\mathsf{I C C}\_{2}\\mathsf{M N N}.

(see sheet "INCL OFF-GRID Option 2" in Excel workbook "Afam PDD Baseline EF calculations v2.3\_corrected").

2^{\\circ}

Determination of emissions factor for CM using only grid connected power plants

Undertaking the same approach to calculate the combined margin for grid connected power plants only, the resulting value for $ E F\_{grid,CM,y} $ equals

\\bar{E F}\_{g\\mathit{f r d,,C M,y}}

(\\mathsf{E F} _{\\mathsf{g e d A M M},\ }^{\*},0.5)+\ (\\mathsf{E F}_{\\mathsf{g e d C M M m m}y,\ }}^{{ _}0.5)=(0.519\ {}^{_}0.5)+(0.573\ {}^{\*}0.5)\ =0.546\ \\mathsf{I O}\_{2}\\mathsf{M W N}.

(see sheet "GRID ONLY Option 2" in Excel workbook "Afam PDD Baseline EF calculations v2.3\_corrected").

0.546 tCO $ \_{2} $ /MWh is the EF $ \_{grid,CM,y} $ value applied for Option 2.

$ \\eta\_{B L} $ 39.5% (conservative default efficiency factor for new gas-fired OCGT units built after 2000, as contained in Annex I of the "Tool to calculate the emission factor of an electricity system" v2.2.1)

The resulting value for $ E F\_{B L, C O 2} $ is calculated to be 0.511 tCO $\_2$/MWh

\ \ t C O{{}}\_/{2}/M W

Version 05.0

* * *

In summary, the following $ E F\_{BL,CO2} $ are applicable:

E F\_{B L,C O2}

- Option 1 has a value of

- Option 2 has a value of


0.519,t O\_{2}/M M h

- Option 3 has a value of

0.546,t C0\_{2}/M M h

0.511,t\ !text{C O}\_{2}/M M!

Given that Option 3, the OCGT emission factor, is the lowest of the three calculated alternatives, Option 3 has been chosen as the basis for calculation of the baseline emissions factor $ E F\_{B L, C O2}. $

E F\_{B L,C O2}.

It is noted that this is significantly lower than the baseline emission factor for the off-grid diesel plant, which in reality is the most likely build margin and combined margin plant for Nigerian electricity supply (0.613 and 0.599 tCO $ \_{2} $ /MWh respectively). Therefore, the proposed baseline emission calculation approach is very conservative compared with the actual situation in Nigeria.

\\mathsf{t C O\_{2}/M W}

Leakage emissions

\ \\mathrm{C H}\_{4}

There is no leakage associated with the project activity, because fugitive upstream $ \\mathrm{C H\_{4}} $ emissions from gas transformation and distribution apply to both the baseline and project scenario. The project will not give rise to increases fugitive emissions and, based upon a lower gas feed requirement, leakage emissions from arising from fugitive $ \\mathrm{C H\_{4}} $ emissions may be negative; however, for the purposes of simplicity and conservativeness $ LE\_{CH4,y} $ will be treated as zero. There will be no LNG consumption in the project activity, so $ LE\_{LNG,CO2,y} $ will be zero. Therefore, leakage emissions are calculated to be zero.

L E\_{C H4,y}

Emission reductions

Emission reductions have been calculated using the following equation:

E R\_{y}=B E\_{y}\\cdot P E\_{y}\\cdot L E\_{y}

Where:

\\begin{array}{r l r l r}{\\pounds P\_{\\nu}}&{\ \ &\ }&{{}=}&{\ \ mathsf e r r i s s i o n s\ r emathsf{e e d c c t o o n s\ i n\ y e a r\ }\ (\ {\\sf I C O}\_{2}\\Theta)}\\end{array}

B.6.2. Data and parameters fixed ex ante

| Data/Parameter | OXIDf |
| --- | --- |
| Unit | - |
| Description | Oxidation factor of natural gas used in the calculation of project emissions. |
| Source of data | 2006 IPCC Guidelines for National Greenhouse Gas Inventories(Volume 2:Energy;Chapter 2:Stationary Combustion;default value for stationary combustion sources) |
| Value(s) applied | 1 |

O X I D\_{t}

B E\_{y}

P E\_{y}

y(\\mathsf{t C O\_{2}e})

y\\left(\\mathsf{t C O\_{2}e}\\right)

y(\\mathsf{t C O\_{2}e})

* * *

| Choice of data or Measurement methods and procedures | Not applicable |
| --- | --- |
| Purpose of data | For estimation of project emissions |
| Additional comment | None |

| Data/Parameter | $EF\_{BL,CO2,y}$ |
| --- | --- |
| Unit | tCO\_{2}/MWh |
| Description | Baseline CO\_{2} emissions factor |
| Source of data | Fuel emissions coefficient (IPCC data) and the energy efficiency of the technology, as estimated in the baseline scenario analysis. See section B.6.1. |
| Value(s) applied | 0.511(see section B.6.1) |
| Choice of data or Measurement methods and procedures | Not applicable |
| Purpose of data | For estimation of baseline emissions |
| Additional comment | None |

\\mathsf{t C O\_{2}/M W h}

\\mathrm{C O\_{2}}

B.6.3. Ex ante calculation of emission reductions

The ex ante calculation of project emissions, baseline emissions, leakage emissions and emission reduction expected during the crediting period, applying all relevant equations provided in the methodology is presented below.

Project emissions:

\\scriptstyle{P E\_{y}}\ =\ {\\sum},{C},{C}\ {C}\ {{}\_{t,y}}\ \ {{{}^{\\star}}C O E F{}}\_t,y

Where (for project fuel; natural gas):

F C\_{,t,y,}

N C V\_{t,y}

G J/m^{3}

E F\_{c O2,t,y}

O X l D\_{t}

48 Enibe, S.O. and Odukwe, A.O. 'Patterns of Energy Consumption in Nigeria' University of Nigeria, 1990. See

* * *

Baseline emissions:

\\bar{B}\\bar{E} _{y}=\\bar{E}\\bar{G}_{P J,y},.,\\bar{E}\\bar{F}\_{B L,C O2,y}

Where:

\ G\_{P J,nu\\\ \\\ \\\ \\\ \\\ \\\ \\\ \\\ }=\ \ 5\ 124.6\ \ G G h/r r^{49}

\\begin{array}{r l r l}{B E\_{y}}&{{}}&{}&{{}=\ (5,124,600,\\times0.511)=2,620,163,160\ {\ /}}{{1C C\_{2}//r}}end{}array

Leakage emissions:

As described in section B.6.1, there are no leakage emissions associated with the project activity.

L E\_{y}\ \ \ \ \ \ \ \ \ \ \ \ \ =\ 0,\\sf{t C O\_{2}/y r}

Emission reductions:

E R\_{y}=B E\_{y}\\cdot P E\_{y}\\cdot L E\_{y}

\\begin{array}{r l}{E\\bar{R}\_{y}}&{{}=\ (2,620,163\\cdot2,069,928\\cdot0)=550,234,1\ 6mathsf\_C2/mathsf/r r}\\end{array}

B.6.4. Summary of ex ante estimates of emission reductions

Table 19: Summary of ex ante estimates of emission reductions

| Year | Baseline emissions (tCO2e) | Project emissions (tCO2e) | Leakage(tCO2e) | Emission reductions(tCO2e) |
| --- | --- | --- | --- | --- |
| 01/11/2012-30/11/2013 | 2620163 | 2069928 | 0 | 550234 |
| 01/11/2013-30/11/2014 | 2620163 | 2069928 | 0 | 550234 |
| 01/11/2014-30/11/2015 | 2620163 | 2069928 | 0 | 550234 |
| 01/11/2015-30/11/2016 | 2620163 | 2069928 | 0 | 550234 |
| 01/11/2016-30/11/2017 | 2620163 | 2069928 | 0 | 550234 |
| 01/11/2017-30/11/2018 | 2620163 | 2069928 | 0 | 550234 |
| 01/11/2018-30/11/2019 | 2620163 | 2069928 | 0 | 550234 |
| 01/11/2019-30/11/2020 | 2620163 | 2069928 | 0 | 550234 |
| 01/11/2020-30/11/2021 | 2620163 | 2069928 | 0 | 550234 |
| 01/11/2021-30/11/2022 | 2620163 | 2069928 | 0 | 550234 |
| Total | 26201630 | 20699280 | 0 | 5502340 |
| Total number of crediting years | 10 |  |  |  |
| Annual average over the crediting period | 2,620,163 | 2,069,928 | 0 | 550,234 |

(t(o o0))

(t(o o0)e)

* * *

B.7. Monitoring plan

Title: Approved monitoring methodology AM0029 (Version 3) “Grid Connected Electricity
Generation Plants using Non-Renewable and Less GHG Intensive Fuel.”

The project activity is a natural gas based power generation project, which feeds electricity
(power) to the regional grid in Nigeria. The project activity meets the methodology
applicability criteria which are as follows:

1. The project activity is the construction and operation of a new natural gas fired grid
   connected electricity generation plant;

2. The geographical/ physical boundaries of the baseline grid are clearly identified and
   information pertaining to the grid and estimating baseline emissions is publicly
   available; and

3. Natural gas is sufficiently available in Nigeria. Future natural gas based power
   capacity additions, comparable in size to the project activity, are not constrained by
   the use of natural gas in this project activity.


All the data to be monitored in order to estimate project, baseline and leakage emissions for
verification and issuance will be kept for two years after the end of the crediting period or the
last issuance of CERs for the project activity, whichever occurs later.

The monitoring methodology requires the following parameters to be monitored during the
crediting period:

For project emissions:

1. Annual fuel(s) consumption in project activity;

2. Net Calorific Value(s) of the fuel used in the project activity;

3. Net Calorific Value(s) of the fuel used in the project activity;

4. Fuel emission factors for fuel used in the project activity.

5. Net Calorific Value(s) of the fuel used in the project activity;

6. Fuel emission factors for fuel used in the project activity.


Baseline emissions will be monitored as per the “Tool to calculate emission factor for an
electricity system”, as applicable. Therefore, according to Option 3 used in the choice of
baseline emissions factor, EFBL (as described above), parameters EG PJ, y and COEFBL must
be monitored. Note that in this context COEFBL is the same parameter as EFCO2,f,y i.e. CO2
factor for natural gas combustion (tCO2/GJ). The data and parameters to be monitored
according to the methodology as described below.

B.7.1. Data and parameters to be monitored
Data / Parameter FC

| Data/Parameter | FCf,1,y |
| --- | --- |
| Unit | m3 |
| Description | Annual quantity of fuel(natural gas) consumed in project activity |
| Source of data | Fuel(natural gas)flow meter reading at Afam plant gas reception facilities(custody transfer point from supplier;point 1 in Figure A4.1) |
| Value(s) applied | 1054203429m3 |
| Measurement methods and procedures | Continuous metering of gas supply both at supplier(Okoloma gas plant)and project end for cross verification and measured in standard cubic meters(m3). |

\\underline{{F}}}\_{,\\underline{{f,1,V}}}

C O E F\_{B l}

\\mathit E O F\_{B L}

(\\mathrm{m}^{3})

Version 05.0

* * *

| Monitoring frequency | Continuous |
| --- | --- |
| QA/QC procedures | Natural gas supply metering(Elster Instromet 2000) to the project will be subject to regular(in accordance with stipulation of the meter supplier) maintenance and testing to ensure accuracy. |
| Purpose of data | For estimation of project emissions |
| Additional comment |  |

| Data/Parameter | FCf2,y |
| --- | --- |
| Unit | m3 |
| Description | Annual quantity of fuel(natural gas) consumed in gas turbine #11 |
| Source of data | Fuel(natural gas)flow meter reading at turbine #11inlet(SM R1-X-KG1600ElsterInstromet meter located at point2inFigureA4.1) |
| Value(s) applied | 351401143m3 |
| Measurement methods and procedures | Daily meter reading |
| Monitoring frequency | Continuous |
| QA/QC procedures | Used to corroborate gas consumption data collected at point1 |
| Purpose of data | For estimation of project emissions |
| Additional comment |  |

F C\_{t,2,y}

\ \_

\\overline{{143,\\mathfrak{m}^{3}}}

| Data/Parameter | FCf3,y |
| --- | --- |
| Unit | m3 |
| Description | Annual quantity of fuel(natural gas) consumed in gas turbine #12 |
| Source of data | Fuel(natural gas)flow meter reading at turbine #12inlet(SM R1-X-KG1600ElsterInstromet meter located at point3inFigureA4.1) |
| Value(s) applied | 351401143m3 |
| Measurement methods and procedures | Daily meter reading |
| Monitoring frequency | Continuous |
| QA/QC procedures | Used to corroborate gas consumption data collected at point1 |
| Purpose of data | For estimation of project emissions |
| Additional comment |  |

F C\_{t,4,y}

\ \_

Version 05.0

* * *

| Measurement methods and procedures | Daily meter reading |
| --- | --- |
| Monitoring frequency | Continuous |
| QA/QC procedures | Used to corroborate gas consumption data collected at point 1 |
| Purpose of data | For estimation of project emissions |
| Additional comment |  |

| Data/Parameter | NCVf,y |
| --- | --- |
| Unit | GJ/m3 |
| Description | The net calorific value(energy content) per volume unit of natural gas used in the calculation of project emissions. |
| Source of data | Based on fortnightly sampling at the Afam plant gas reception point(point 1 in Figure A4.1) |
| Value(s) applied | 0.035 GJ/m3(The value chosen represents an estimate of NCV for Nigerian natural gas reserves.Source:Enibe,S.O.andOdukwe,A.O.Patterns of Energy Consumptionin NigeriaUniversityofNigeria,1990) |
| Measurement methods and procedures | Gas samples collected using SPDC standard gas sampling protocol and analysed using standard gas chromatography techniques in on-site laboratory.Fortnightly sampling and analysis to be carried out in accordance with AM0029. |
| Monitoring frequency | Fortnightly |
| QA/QC procedures | The calorific value of the gas will be recorded by the project participant and cross-checked against measurements made,and provided,by the gas supplier. |
| Purpose of data | For estimation of project emissions |
| Additional comment |  |

N C V\_{t,y}

G J/m^{3}

G n/m^{3}

| Data/Parameter | EFCO2,f,y |
| --- | --- |
| Unit | tCO2/GJ |
| Description | CO2 emission factor per unit of energy of natural gas used in the calculation of project emissions. |
| Source of data | Based on fortnightly sampling at the Afam plant gas reception point (point 1 in Figure A4.1) |
| Value(s) applied | 0.0561(IPCC default for natural gas,2006) |
| Measurement methods and procedures | Gas samples collected using SPDC standard gas sampling protocol and analysed using standard gas chromatography techniques in on-site laboratory. |
| Fortnightly sampling and analysis to be carried out. Minimum measurement- yearly in accordance with the AM0029. |  |

\\underline{{E F\_{C O2,t,y}}}

\ C{O\_{2}}/G G

{\\mathrm O\_{2}}

Version 05.0

* * *

| Monitoring frequency | Fortnightly |
| --- | --- |
| QA/QC procedures | The CO2 content of the gas will be recorded by the project participant and cross-checked against measurements made, and provided, by the gas supplier. |
| Purpose of data | For estimation of project emissions |
| Additional comment |  |

{\\mathrm O\_{2}}

| Data/Parameter | EGPJ,5,y |
| --- | --- |
| Unit | MWh |
| Description | Electricity produced by gas turbines(GT12&GT13) |
| Source of data | Electricity meters installed in the plant power export point to bus-bar(meter typeEDMI MK6E with accuracy class0.2S.IEC62052-11/62053-22) |
| Value(s) applied | 3547800MWh |
| Measurement methods and procedures | Continuous metering of electricity supplied by the gas turbines to the bus-bar of the Afam plant |
| Monitoring frequency | Continuous |
| QA/QC procedures | Metered export of electricity to be checked against data on power received by the grid operator(PHCN)at the Afam plant-grid interface points.Accuracy of meters are to be tested every 180 days as outlined in section7.3of thePPA and calibration of meters needs to be undertaken if electrical energy measured by the system differs by over half a percent(0.5%)from any back-up system. |
| Purpose of data | For estimation of baseline emissions |
| Additional comment |  |

E G\_{P\ ,J,,5,y}

| Data/Parameter | EGPJ,6,y |
| --- | --- |
| Unit | MWh |
| Description | Electricity produced by gas turbine and steam turbine(GT 11&ST) |
| Source of data | Electricity meters installed in the plant power export point to bus-bar.(meter type EDMI MK6E with accuracy class0.2S/0.55.IEC62053-22/62052/11) |
| Value(s) applied | 1576800MWh |
| Measurement methods and procedures | Continuous metering of electricity supplied by the steam turbine to the bus-bar of the Afam plant. |
| Monitoring frequency | Continuous |
| QA/QC procedures | Metered export of electricity to be checked against data on power received by the grid operator(PHCN) at the Afam plant-grid interface points.Accuracy of meters are to be tested every180days as outlined in section7.3of thePPAand calibration of metersneeds to be undertaken if electrical energy measured by the system differsby over half a percent(0.5%)from any back-up system. |
| Purpose of data | For estimation of baseline emissions |

E G\_{P\ ,!,,,,,,}

Version 05.0

* * *

| Additional comment |  |
| --- | --- |

B.7.2. Sampling plan

Not applicable for this project activity

B.7.3. Other elements of monitoring plan

The monitoring information will be collected routinely as part of good practice and input into
Shell Petroleum and Development Company of Nigeria’s greenhouse gas reporting system.

All procedures for collecting data are outlined in the Afam VI Power Project Operations and
Maintenance Reports . Responsible personnel will be identified and briefed on their
responsibilities in light of the monitoring plan described in the previous section (i.e. meter
locations, calibration requirements, monitoring frequency, recording methodology).

All data will be recorded in a purpose built MS Excel spreadsheet. Data will be stored on
SPDCs’ computer server and backed up regularly.

B.7.4. Date of completion of application of methodology and standardized baseline
and contact information of responsible persons/ entities

Date: Final version submitted: 05/07/2012

Persons undertaking the baseline calculation:

Frederik Beelitz /Peter Robinson, Economic Consulting Associates (ECA)
41 Lonsdale Road, London NW6 6RA, UK
Tel: +44 (0)20 7604 4546

SECTION C. Duration and crediting period

C.1.1. Start date of project activity

Tel: +44 (0)20 7604 4546
Fax: +44 (0)20 7604 4547

9 December 2005. This is the date when the Engineering, Procurement and Construction
(EPC) project contract was signed between Shell and Daewoo and includes cost estimates

Tel: +44 (0)20 8870 3330

Email: [enquiries@carbon-counts.com](mailto:enquiries@carbon-counts.com) for the Long Term Service Agreement (LTSA). The EPC and LTSA are therefore contained
50
in the same document. It is therefore in alignment with the definition provided in the CDM
Glossary of Terms which states that “the start date shall be considered to be the date on
which the project participant has committed to expenditures related to the implementation or
related to the construction of the project activity. This, for example, can be the date on which
contracts have been signed for equipment or construction/operation services required for the
project activity.....”

C.1.2. Expected operational lifetime of project activity

Twenty (20) years.

C.2. Crediting period of project activity

Fixed term crediting period

C.2.1. Type of crediting period

C.2.2. Start date of crediting period

st
1 November 2012

1^{\\mathrm{s t}}

C.2.3. Length of crediting period

10 years (120 months)

SECTION D. Environmental impacts

D.1. Analysis of environmental impacts

An Environmental Impact Assessment (EIA) for the Afam Power Plant Project was
completed in November 2004 and approved by the Nigerian Federal Ministry of Environment
on 9 June 2005 (see Figure 7 below). The full EIA is available upon request from the project
proponent.

50
Shell Petroleum Development Company of Nigeria, Company Cost Estimate, Afam power Plant
EPC and LTSA Contracts, Tender No: E – 16618, October 2005

* * *

Figure 7: Afam Power Plant Project Environmental Impact Statement Certificate

\[Image: R1484\]

\[Image: R1484\]

\[Image: R1484\]

\[Image: R1484\]

\[Image: R1484\]

\[Image: R1484\]

\[Image: R1484\]

\[Image: R1484\]

An overview of the key conclusions of this study is provided below (section D.2).

D.2. Environmental impact assessment

In line with the national regulatory requirements of the Federal Ministry of Environment
(FMENV), the Department of Petroleum Resources (DPR) and SPDC’s Environmental
Policy, a detailed Environmental Impact Assessment (EIA) of the Afam Power Plant Project
has been prepared in order to ensure that the project activities are executed without adverse
effect on the environment. The EIA study was based on existing information on this area,
site-specific fieldwork, laboratory analysis of samples, consultations (with host communities
and other stakeholders) and a number of workshops involving consultants and other
stakeholders including regulatory agencies.

An Environmental Management Plan (EMP) has been developed so that the mitigation
measures prescribed in the EIA document can be implemented (the EMP forms Chapter 6 of
the EIA report). The EMP includes a programme of environmental monitoring to assess the
efficacy of the mitigation measures and to identify any impact arising from the project that
has not been addressed in the EIA. Therefore the overall impacts associated with the
proposed project can be managed within responsible and acceptable limits by applying the
mitigation measures and management strategy outlined in the EMP.

A summary of the major impacts and mitigation measures identified in the EIA is provided in
Table 20.

* * *

| Project phase | Description of impact | Significance rating before (and after mitigation) |
| --- | --- | --- |
| Construction | Influx of people | High(Medium) |
| Alteration of natural soil profile | Medium(Low) |  |
| Soil Degradation and Soil/Groundwater Contamination | Medium(Low) |  |
| Pollution of Imo River | Medium(Low) |  |
| Reduction in air quality | Medium(Low) |  |
| Increase in respiratory diseases | High(Low) |  |

| Measure(or) | Mitigation |
| --- | --- |

* * *

| Project phase | Description of impact | Significance rating before (and after) mitigation |
| --- | --- | --- |
|  | Reduction in biodiversity /loss of flora and fauna | Medium(Low) |
| Increase in noise nuisance | High(Low) |  |
| Operation | Injury / fatalities in workforce/communities | Medium(Low) |
| Pollution of Imo River | Medium(Low) |  |

| Measure (her) | Mitigation |
| --- | --- |
|  | Increase in respiratory diseases |
| Reduction in air quality | Medium(Low) |
| Soil Degradation and soil/Groundwater contamination | Medium(Low) |
| Risk/exposure to electric shock | Medium(Low) |
| Demolition | Increase in dust generation |
| Injury/fatalities in workforce/communities | Medium(Low) |
| Increase in respiratory diseases | High(Low) |

| Site Care Number | Mitigation |
| --- | --- |
|  | Nose masks shall be worn by site workers during (dusty) operations.Water shall be sprayed on construction site to reduce dust levels especially during dry season.Pre-mob inspections and regular maintenance of equipment shall be conducted.Upgrade and support of existing health services and facilities(NEPA).SPDC yellow guide for health shall be implemented.Construction workers shall be compelled to wear PPEs equipment.SPDC shall ensure that all mobile and stationary internal combustion engines are properly maintained.Provide containment for chemicals and liquid discharges;SPDC waste management policy shall be enforced.SPDC shall ensure that O&M contractor staff strictly adheres to known safety procedures, when work is in progress.Demolition contractor shall take inventories of all materials that are likely to be encountered.Positively identify and categorize all waste types;Establish a procedure to manage the dislodgement processPut a waste management plan in place;Ensure that demolition process is subject to regulatory approval;Ensure that adequate emergency response procedures are in place;Ensure proper use of PPE by site workers.Compulsory medical fitness test for all SPDC and contractor personnel.First Aid training of workforce(i.e.1:50).Upgrade of existing NEPA clinic to include emergency unit.Safety awareness training for workforce and selected representatives of main communities(Ayama and Okoloma).Demolition contractor shall establish occupational health monitoring for site workers;Enforce use of nose masks and other PPEs;Provide special training for those handling asbestos. |

The EIA also assesses the key benefits associated with the Afam power project, and how
these positive impacts can be enhanced. There are briefly described below.

Job creation and economic enhancement

* * *

A total of 877 (678 skilled, 131-semi-skilled and 69 unskilled) persons, mainly from the
neighbouring communities are to be employed by the project during construction phase.
Once in operation, the project will employ 50 skilled persons. These jobs will continue over
the estimated project duration (20 years). During the demolition phase, jobs are also
expected to be available for locals and nationals even if at a lower rate than during the
construction phase. So as to ensure enhanced job creation opportunities throughout the life
of the project, SPDC shall ensure that all subcontracts for supplies and minor repairs are
reserved for qualified contractors from the project area in the first instance. The surveys of
the communities revealed many workers with some skills, which may not meet the required
standards for the project. SPDC shall suggest to the EPC & O&M contractors that such
persons and local contractors from these communities could formally register with a skills’
registration centre, which could be established for the project so that initial considerations
shall be given to them for employment and contracts.

As part of sustainable approach to community interaction, SPDC, under its community
development programme (CDP) shall embark on the necessary support, which shall include
micro-credit schemes, to the communities such that they take advantage of the business
opportunities available at Afam as a result of this project.

Increase in efficiency of gas use and electricity generation

The Afam power project will increase the available on-grid power generation capacity in
Nigeria, reducing the self-generation that many households and businesses would otherwise
need to fall back on. The project will achieve this increase in reliability and reduction in
economic cost to consumers with substantially lower emissions than the more financially
attractive open-cycle project alternative and with far lower emissions than consumer selfgeneration form diesel would produce for the same output.

The amount of gas slated for use and the planned power generation capacity represent a
potential for significant improvement over existing historical data on gas use and power
generation at Afam. The power station shall be operated for 20 years and proper
maintenance shall ensure breakdown of the plant is avoided and output is maintained.
Guaranteed electricity output would improve industrial and domestic activities within the
country. Given the history of successful private sector participation in business which SPDC
is expected to bring into the power sector and the power purchase agreement with NEPA,
the plant is most likely to be run better, hence, efficiency of gas use and power generation
will increase.

Improvement of local infrastructure

The project provides important employment, training and development opportunities for the
local community. As well as training of selected NEPA and other qualified Nigerians in
acquiring new skills for the operation and maintenance of the turbines, opportunities for
turbine-related technology training have been extended to some locals and nationals who
would not be hired for the project but could put their newly acquired training and experience
to good use in appropriate locations elsewhere in the country given the proposals by NEPA and other bodies to build more power plants. As part of the project development, 140 youths
from neighbouring communities will be given Workforce training in areas such as welding to
enable them acquire skills that will open up to them future employment opportunities. It will
also facilitate technology transfer by building up the capacity in Nigeria for the operation of
CCGT power plants.

SECTION E. Local stakeholder consultation

E.1. Solicitation of comments from local stakeholders

It is the policy of SPDC to consult with stakeholders and relevant authorities in all its
activities and the New SPDC EIA process manual requires that such consultation should
take place. The three key stakeholders most relevant to the Afam power project have been
identified as the local communities, government agencies, and the project main contractor.
There are a total of 14 major communities and 32 satellite communities impacted by the
project.

A key stated objective of the project EIA was to integrate the opinions and views of all
stakeholders, particularly host communities into the project design in order to ensure that the
completed project is both environmentally and socially sustainable. An initial scoping
workshop to consult with stakeholders was convened in Port Harcourt on June 19, 2003, the
primary objective of which was to identify the terms of reference and context of the EIA (see
Section D). This workshop was attended by:

• Four representatives of each of the communities involved;
• Representatives from the federal and state government regulators: Federal Ministry

• Representatives from the federal and state government regulators: Federal Ministry
of Environment (FMENV); Department of Petroleum Resources (DPR); Rivers State
Ministry of Environment;
• Representatives of Oyigbo Local Government within which the project is located;

• Representatives of Oyigbo Local Government within which the project is located;
• Key project staff from SPDC;
• Non Governmental Organisations (NGOs) - representatives from the Living Earth

• Non Governmental Organisations (NGOs) - representatives from the Living Earth
Foundation and the Nigerian Environmental Society.

The broad objectives of the workshop were:

• Education and enlightenment of identified stakeholders (communities, Government
agencies, non-governmental organizations (NGOs), community based organizations
(CBOs) etc., on the need for their involvement in the conduct of the study and to
assist the project team in articulating the concerns of the communities as well as
those of their immediate environment;
• Building trust and confidence that would enhance the capacities of the identified

The identified community stakeholders were informed by means of visits of their expected
participation during the commencement of fieldwork. At the field locations, the study team
met the Chief/Paramount Ruler, the Chairman of the Community Development Committee
(CDC), the Women leader and the youth leader and discussed the objectives of the study.
This helped in securing the social license to conduct baseline studies in these communities.
Consultation with other stakeholders is ongoing and shall be sustained throughout the
duration of the project. The record of consultation undertaken as part of the EIA process is
shown in Table 21 below.

stakeholders through participation in the project.
• Forming and promoting partnership with identified stakeholders through networking,
information sharing and participation in consultation exercises.

* * *

Table 21: Stakeholder consultation events

| Date(s) | Stakeholders | Event |
| --- | --- | --- |
| April 8,2002 | SPDC Afam Project Team & Okoloma representatives | Courtesy visit to Okoloma, landlord |
| October 16,2002 | SPDC&Okoloma community | Consultation with community on proposed EIA study |
| February 7,2004 | NEPA | Letter of permission granted to SPDC to enter NEPA Afam facilities |
| March 13,2003 | Egberu Community | Letter of request for inclusion in EIA study for Afam Power Plant |
| March 17,2003 | Egberu Community | Letter of nomination of Egberu community representatives for the EIA studies for Afam Power Plant |
| March 20,2003 | SPDC CLO,EIA consultant,Okoloma&Ayama community reps. | Meeting with communities for the Afam Power Plant field work |
| June 19,2003 | 8 communities,FMENV,RSMENV,ASMENV,Oyigbo LGA Chairman,NGOs&SPDC Afam Project Team | EIA Scoping workshop |
| March 16,2004 | SPDC Afam Project Team,NEPAM management&unions(NUEE&SSA) | Meeting to present the questionnaire to be administered to the NEPA staff |
| March 29to April 22004 | Afam EIA consultants,FMENV,RSMENV,NES,NEPA,SPDC AfamTeam&SGSI | Workshop on the new EIA process of SPDC and the integration of the biophysical,social and health data into the EIA |
| March $18^{\\textcircled{th}}$2010 | All 16 Afam Communities,NNPC,Shell Afam Team | Stakeholders CDM engagement meeting |

An EIA Feedback Session (Open Forum) with Stakeholders for the Afam Power Plant project
was subsequently held on Tuesday, September 14, 2004 in Port Harcourt. The session was
used to discuss the findings of the EIA with the same stakeholders who were present at the
Scoping Workshop of June 19, 2003. A representative of the National Inland Waterways
Authority was present at this session. The feedback from this session was incorporated into
the Afam power project EIA report and Environmental Management Plan.
A broader Stakeholders Engagement Plan was subsequently developed for the Afam

A broader Stakeholders Engagement Plan was subsequently developed for the Afam
Integrated Gas and Power Project in June 2005 (document number: AFM-TPI-000-F01-
00003). Its objectives are:

1. To identify and relate with the stakeholders within the Afam Integrated Gas and
   Power Project environment

2. To create awareness and communicate the details of the planned Afam Integrated

3. To create awareness and communicate the details of the planned Afam Integrated
   Gas and Power Project.

4. To understand Community’s perceptions and concerns about the project.

5. To understand Community’s perceptions and concerns about the project.

6. Sensitize Stakeholders on their expected roles and Responsibilities to the success of

7. Sensitize Stakeholders on their expected roles and Responsibilities to the success of
   the project.

8. To decide and agree Community Development interventions and strategies.

9. To identify opportunities for local Capacity building and Community Development.


The Stakeholder Engagement Plan describes how external stakeholder engagement and
campaigns have been approached according to four levels of engagement, as summarized
in Table 22 below:

* * *

Table 22: External Stakeholder Engagement plan

| Levels/Dates | Objectives | Target group | Frequency of Meeting |
| --- | --- | --- | --- |
| Level 1General Top Level leadersDate: July,2005 | Create awareness andBuild Partnership;Understand project,SD,SCD approach,PAC model,Government role/support,obtain feedback,Appreciate Roles | State Governments(Rivers and Abia) | Yearly meeting |
| Level 2Government Officials,Media Chiefs,Community leadership/Active leaders in the fieldDate:July,2005 | Understand project,SD,SCD approach,PAC model,Government role/support,Obtain feedback:Build partnership for field execution of project;understand specific requirements from each | State Government Focal PointsHon members of State Houses of assemblyLGA ChairmenPolice Commissioners CO,Nigerian NavyJTFNDDC | Yearly |
| Level 3Grassroots fora/palliament Per community&satellite settlementsDate:July,2005. | Create awareness and appreciation of project andCR approach.Appreciate obligations from all parties | Reps of all segments of the communities.200-350 persons per community | Yearly |
| Level 4Youth Forum,Community youth leaders andCouncil counsellorsDate:August,2005 | Create awareness for the project,Regular communication session,and establish a grievances communication structure. | Youth leaders from the major Communities and elected council counsellors.2 representative per Community10,OYILGA and 2 Ukwa-west Counsellors.Total:40 persons. | Quarterly |

A further stakeholder engagement workshop was held by SPDC on 18 March 2010 in order
to communicate the potential benefits associated with the Afam power project, the objectives
of the CDM and to seek feedback from those communities affected. The event was attended
by 53 leaders and representatives from those communities affected by the project including
the Okoloma, Egberu, Komkom, Afam-Nta, Ayama, Izuoma, Umuosi, Mgbosi and Oyigbo
communities.

* * *

E.2. Summary of comments received

Comments received from the stakeholders including local communities have been included
in the Afam project design from an early planning stage through to construction, as an
integral part of the EIA process. Detailed comments and written feedback provided during
several events held as part of the stakeholder engagement process associated with the EIA
are provided in Appendix D of the full EIA Report.

Written comments were also received during the stakeholder engagement workshop held on
18 March 2010. Detailed feedback was provided by 24 individuals representing those
communities affected by the project. These are provided as copies available to the validator.
A wide range of comments were received during the event, covering a range of issues and
potential concerns. These are summarised in Table 23 below, grouped into positive impacts
and negative impacts (and/or concerns) identified in connection with the project.

Table 23: Summary of stakeholder workshop responses

| Issue | Number of written comments |
| --- | --- |
| Positive impacts associated with Afam power project | 20 |
| Increased employment, business growth, prosperity and development | 8 |
| Increased reliability of electricity supply to communities | 3 |
| Improved levels of other community services (water, roads, education) | 2 |
| The project will lead to reduced CO2 emissions | 2 |
| Positive overall improvement to community (benefits unspecified) | 2 |
| Electricity has replaced reliance on wood or generators as a primary energy source | 2 |
| Reduced noise pollution(associated with generator usage) | 1 |
| Negative impacts(and/or concerns raised) associated with Afam power project | 12 |
| Electricity supply problems remain in some communities | 3 |
| Gas flaring has continued | 3 |
| Economic and employment benefits have not been felt | 3 |
| Increased noise pollution | 1 |
| Influx of people has lead to increased social vices and security issues | 1 |
| No overall improvement to community | 1 |

\\mathrm{C O\_{2}}

Despite these benefits, several key concerns were raised. These included comments
expressing the view that the expected economic and employment benefits arising from the
project had not been felt in a particular community, and that electricity supply had not improved. Several stakeholders also suggested that gas flaring had not been reduced from
the Afam project as expected. There was some indication that benefits had not been felt
similarly across the affected region, with certain communities expressing the view that they
had not significantly benefited from the project, most noticeably the Kom kom and Oyigbo
communities.

E.3. Report on consideration of comments received

It is the policy of SPDC to take into consideration all concerns and suggestions of
stakeholders during the design, construction and implementation of all projects. During the
project implementation SPDC organised various stakeholders meetings and discussion
groups, and the suggestions made – and concerns raised - have been integrated into the
project design.

Further details of how the stakeholder issues and concerns have been included in to the
implementation and management of the project are contained in Appendix 2 ‘Stakeholders
Analysis’ of the Afam Integrated Gas and Power Project Stakeholder Engagement Plan
(both documents will be made available to the validator).

SECTION F. Approval and authorization

The Host Country Approval and Authorization from Federal Ministry of Environment, Special
Climate Change Unit, Government of Nigeria received on 21st June 2010 vide Letter No.
FMENV/SCCU/SPDC/21/06/10.

* * *

* * *

Appendix 1. Contact information of project participants
and responsible persons/ entities

| Project participant and/or responsible person/entity | ☐Project participant☐Responsible person/entity for application of the selected methodology(ies)and,where applicable,the selected standardized baselines tothe project activity |
| --- | --- |
| Organization name | Shell Petroleum Development Company of Nigeria Limited |
| Street/P.O. Box | P O Box 263 Port Harcourt,Nigeria |
| Building |  |
| City | Port Harcourt |
| State/Region | Rivers State |
| Postcode | 263 |
| Country | Nigeria |
| Telephone | +2348070221027 |
| Fax |  |
| E-mail | [C.Ozumba@Shell.com](mailto:C.Ozumba@Shell.com) |
| Website | [www.shell.com](http://www.shell.com/) |
| Contact person | Chinyere Ozumba |
| Title | Dr |
| Salutation |  |
| Last name | Ozumba |
| Middle name |  |
| First name | Chinyere |
| Department | Biodiversity Conservation and CO2/CDM |
| Mobile |  |
| Direct fax |  |
| Direct tel. | +2348070221027 |
| Personal e-mail |  |

\| Project participant and/or responsible person/entity \| ☐ Project participant

☒ Responsible person/entity for application of the selected methodology(ies)and,where applicable,the selected standardized baselines to the project activity \|
\| \-\-\- \| \-\-\- \|
\| Organization name \| Economic Consulting Associates(ECA) \|
\| Street/P.O.Box \| 41 Lonsdale Road,London \|
\| Building \| \|
\| City \| London \|
\| State/Region \| London \|
\| Postcode \| NW6 6RA,UK \|
\| Country \| United Kingdom \|
\| Telephone \| +44(0)2076044546 \|
\| Fax \| \|
\| E-mail \| [info@eca-uk.com](mailto:info@eca-uk.com) \|
\| Website \| \|

Version 05.0

* * *

| Contact person | Frederik Beelitz |
| --- | --- |
| Title |  |
| Salutation |  |
| Last name | Beelitz |
| Middle name |  |
| First name | Frederik |
| Department | Consultancy |
| Mobile |  |
| Direct fax |  |
| Direct tel. | +44(0)2076044546 |
| Personal e-mail |  |

\| Project participant and/or responsible person/entity \| ☐ Project participant

☑ Responsible person/entity for application of the selected methodology (ies) and, where applicable, the selected standardized baselines to the project activity \|
\| \-\-\- \| \-\-\- \|
\| Organization name \| Carbon Counts \|
\| Street/P.O. Box \| 5 Dalby Road,London \|
\| Building \| \|
\| City \| London \|
\| State/Region \| London \|
\| Postcode \| SW18 1AW,UK \|
\| Country \| United Kingdom \|
\| Telephone \| +44(0)2088703330 \|
\| Fax \| \|
\| E-mail \| [enquiries@carbon-counts.com](mailto:enquiries@carbon-counts.com) \|
\| Website \| [www.carbon-counts.com](http://www.carbon-counts.com/) \|
\| Contact person \| Greg Cook \|
\| Title \| \|
\| Salutation \| \|
\| Last name \| Cook \|
\| Middle name \| \|
\| First name \| Greg \|
\| Department \| Consultancy \|
\| Mobile \| \|
\| Direct fax \| \|
\| Direct tel. \| +44(0)2088703330 \|
\| Personal e-mail \| \|

Appendix 2. Affirmation regarding public funding

Not applicable. There is no public funding for this project activity.

Version 05.0

* * *

Appendix 3. Applicability of methodology and
standardized baseline

The choice and description of baseline scenario is included in section B.4 and the choice
and calculation of the baseline emissions factor is described in section B.6. As explained in
the main body of the PDD, the full calculations and underlying data are provided for (a) the
grid-only power plants, and (b) the use of grid power plus off-grid power in the Excel
workbook “Afam PDD Baseline EF calculations v2.3\_corrected”

For the purposes of calculating the Baseline EF for this project, only the GRID
calculations have been used.

Appendix 4. Further background information on ex ante
calculation of emission reductions

Not applicable

Appendix 5. Further background information on
monitoring plan

The monitoring information contained in this Annex is provided in line with the approved
monitoring methodology AM0029 and complements the information provided under sections
B.6 and B.7. The purpose of this Annex is to facilitate preparation of the monitoring reports
during the crediting period for the CDM project activity.

Table A4.1 provides details for each of the monitoring points in compliance with the
monitoring requirements of AM0029. The monitored data parameters referred to in Table
A4.1 refer to the specific monitoring points illustrated in Figure A4.1 below.

Version 05.0

(E(\_{P J,y})

Figure A4.1. Monitoring points for natural gas consumption ( FCf,y) and electricity generation
(EGPJ,y).

(F c\_{t,y})

* * *

\[Image: R1551\]

* * *

Calibration Verification
Verification
gas
reading
(Okolama
Plant)
undertaken
Operations
Manager
Verification
gas
metering
1
undertaken
Operations
Manager
Verification
gas
metering
1
undertaken
Operations
Manager
Verification
gas
metering
1
undertaken
Operations
Manager

| Data/Parameter | DataUnit | Description | Source of data | Measured(m), calculated(c), or estimated(e) | Recording frequency | Propn of to monitor |
| --- | --- | --- | --- | --- | --- | --- |
| FCt1,y | m3 | Annual quantity of fuel (natural gas) consumed in project activity | Fuel (natural gas) flow meter reading at Afam plant gas reception facilities(custody transfer point from supplier; point 1 in Figure A4.1) | m | Continuous metering of gas supply; recorded daily | 10 |
| FCt2,y | m3 | Annual quantity of fuel (natural gas) consumed in gas turbine #11 | Fuel (natural gas) flow meter reading at turbine #1 inlet(SM R1-X-KG1600 Elster Instromet located at point2 in Figure A4.1) | m | Daily meter reading | 10 |
| FCt3,y | m3 | Annual quantity of fuel (natural gas) consumed in gas turbine #12 | Fuel (natural gas) flow meter reading at turbine #2 inlet(SM R1-X-KG1600 Elster Instromet located at point3 in Figure A4.1) | m | Daily meter reading | 10 |
| FCt4,y | m3 | Annual quantity of fuel (natural gas) consumed in gas turbine #13 | Fuel (natural gas) flow meter reading at turbine #3 inlet(SM R1-X-KG1600 Elster Instromet located at point4 in Figure A4.1) | m | Daily meter reading | 10 |

| Portio data be stored | Data archiving(electronic/paper) | QA/QC procedures to be applied | Person(s) responsible for: |  |  |
| --- | --- | --- | --- | --- | --- |
| Measurement | Calibration | Verification |  |  |  |
| 0% | Electronic | Natural gas supply metering(Elster Instromet 2000)to the project will be subject to regular(in accordance with stipulation of the meter supplier) maintenance and testing to ensure accuracy. | Gas entering plant recorded daily by Operator | To be carried out annually according to meter supplier methods | Verification with gas supply reading(Okolama Gas Plant) undertaken by Operations Manager |
| 0% | Electronic | Used to corroborate gas consumption data collected at metering point1 | Gas entering plant recorded daily by Operator | To be carried out annually according to meter supplier methods | Verification with gas metering point1 undertaken by Operations Manager |
| 0% | Electronic | Used to corroborate gas consumption data collected at metering point1 | Gas entering plant recorded daily by Operator | To be carried out annually according to meter supplier methods | Verification with gas metering point1 undertaken by Operations Manager |
| 0% | Electronic | Used to corroborate gas consumption data collected at metering point1 | Gas entering plant recorded daily by Operator | To be carried out annually according to meter supplier methods | Verification with gas metering point1 undertaken by Operations Manager |

* * *

CDM-PDD-FORM

| Data/Parameter | DataUnit | Description | Source of data | Measured(m), calculated(c), or estimated(e) | Recovery frequency |
| --- | --- | --- | --- | --- | --- |
| NCVf,y | GJ/m3 | The net calorific value(energy content) per volume unit of natural gas used in the calculation of project emissions. | Based on fortnightly sampling at the Afam plant gas reception point(point 1inFigureA4.1) | m | Fortnight sample and analysis |
| EFCO2,f,y | tCO2/GJ | CO2 emission factor per unit of energy of natural gas used in the calculation of project emissions. | Based on fortnightly sampling at the Afam plant gas reception point(point1inFigureA4.1) | m | Fortnight sample and analysis |

| Bonding frequency | Proportion of data to be monitored | Data archiving (electronic/paper) | QA/QC procedures to be applied | Person(s) responsible for: |  |  |
| --- | --- | --- | --- | --- | --- | --- |
| Measurement | Calibration | Verification |  |  |  |  |
| Lightly bonding basis | 100% | Electronic | Gas samples collected using Shell Nigeria standard gas sampling protocol and analysed using standard gas chromatography techniques in on-site laboratory.The calorific value of the gas will be recorded by the project participant and cross-checked against measurements made,and provided,by the gas supplier. | Undertaken fortnightly at Afam plant by Technician and by gas supplier(Okolama gas plant)and | Calibration will be carried out by Technician at both gas supply and plant end. | Verification performed between gas supply and plant readings. |
| Lightly bonding basis | 100% | Electronic | Gas samples collected using Shell Nigeria standard gas sampling protocol and analysed using standard gas chromatography techniques in on-site laboratory.The CO2content of the gas will be recorded by the project participant and cross-checked against measurements made,and provided,by the gas supplier. | Undertaken fortnightly at Afam plant by Technician and by gas supplier(Okolama gas plant)and | Calibration will be carried out by Technician at both gas supply and plant end. | Verification performed between gas supply and plant readings. |

N C V\_{t,y}

G l/m^{3}

{\\mathrm O}\_{2}

E F F o{,}t,{}y

^{\\mathrm{t C!}}\_{\\mathrm{G J}}^{\\mathrm{t C!}}

{mathrm\\mathbf{c O\_{2}}}

* * *

CDM-PDD-FORM

| Data/Parameter | DataUnit | Description | Source of data | Measured(m), calculated(c), or estimated(e) | Recording frequency | Propn of to monitor |
| --- | --- | --- | --- | --- | --- | --- |
| EGPJ5,y | MWh | Electricity produced by gas turbines(GT12&GT13) | Electricity meters installed in the plant power export point to bus-bar(meter typeEDMI MK6E with accuracyclass0,2S/0,55.IEC62053-22/62052/11) | m | Continuous metering of electricity supplied by the gas turbines to the bus-bar of the Afam plant. | 10 |
| EGPJ6,y | MWh | Electricity produced by gas turbine and steam turbine(GT11&ST) | Electricity meters installed in the plant power export point to bus-bar(meter typeEDMI MK6E with accuracyclass0,2S/0,55.IEC62053-22/62052/11) | m | Continuous metering of electricity supplied by the gas turbine and steam turbine to the bus-bar of the Afam plant. | 10 |

| Import data be scored | Data archiving(electronic/paper) | QA/QC procedures to be applied | Person(s) responsible for: |  |  |
| --- | --- | --- | --- | --- | --- |
| Measurement | Calibration | Verification |  |  |  |
| 0% | Electronic | Metered export of electricity to be checked against data on power received by the grid operator(PHCN) at the Afam plant-grid interface points,and calibration of meters needs to be undertaken if electrical energy measured by the system differs by over half a percent(0.5%)from any back-up system. | Meter reading to be recorded daily by Operators | Plant Engineer to ensure meters are calibrated at least every 180-days,as outlined in section7.3of thePPA) | Main and Check Tariff Meters used for verification by Operator |
| 0% | Electronic | Metered export of electricity to be checked against data on power received by the grid operator(PHCN) at the Afam plant-grid interface points.Accuracy of meters are to be tested every180days as outlined in section7.3of thePPAand calibration of meters needs to be undertaken if electrical energy measured by the system differs by over half a percent(0.5%)from any back-up system. | Meter reading to be recorded daily by Operators | Plant Engineer to ensure meters are regularly calibrated.See QA/QC procedure. | Main and Check Tariff Meters used for verification by Operator |

* * *

CDM-PDD-FORM

| Data/Parameter | DataUnit | Description | Source of data | Measured(m), calculated(c), or estimated(e) | Recording frequency |
| --- | --- | --- | --- | --- | --- |
| OXIDf | - | Oxidation factor of natural gas used in the calculation of project emissions. | 2006 IPCC Guidelines for National Greenhouse Gas Inventories | e | Annual |

| Proportion of data to be monitored | Data archiving (electronic/paper) | QA/QC procedures to be applied | Person(s) responsible for: |  |  |
| --- | --- | --- | --- | --- | --- |
| Measurement | Calibration | Verification |  |  |  |
| 100% | IPCC(2006) guidelines will be kept | N/A | N/A | N/A | N/A |

* * *

Appendix 6. Summary of post registration changes

The name tags on the project gas turbines ‘GT1, GT2 and GT3’ as shown in figures 4 and A4.1 of
the registered PDD are now corrected as GT13, GT12 and GT11 respectively in the revised PDD.
Related corrections made in the name tags of the gas turbines under Table A4.1 and Section B.7.1
of the revised PDD.

In the actual implementation of the project activity, the connections of the meters to the electrical
generators were slightly modified. The electricity produced from GT 11 and Steam turbine
generators are metered from point (6) while electricity produced from GT 12 and GT 13 generators
are metered from point (5). In line with Project Standard, version 07, Appendix 1, paragraph 6, this
is the case of change of connection of meter(s). This modification does not have any impact on the
emission reductions; the electricity generated used in the baseline emission estimation is the
summation of electricity generated from all the turbines. The monitoring points remain unchanged
from that registered in the PDD.

The name tag of the natural gas flow metering point at the turbine #13 inlet has been corrected to
make consistent with Table A4.1 of the PDD.

Also, due to the format of the version 05 PDD form in VVS template, table 2 of the original PDD in
VVM template is no longer applicable and hence the re-numbering of the tables in the revised
PDD.

Annex 1 has modified the Project participant contact point details and added the information on the
entities involved for determination of baseline and preparation of the PDD as per the requirement
of VVS track PDD completion guideline.

The typographical error in Figure and Table heading numbering under Appendix 5 and throughout
in the PDD are corrected as A4.1.

* * *

Document information

| Version | Date | Description |
| --- | --- | --- |
| 05.0 | 25 June 2014 | Revisions to: |
| ·Include the Attachment: Instructions for filling out the project design document form for CDM project activities (these instructions supersede the“Guidelines for completing the project design document form”(Version01.0)); |  |  |
| ·Include provisions related to standardized baselines; |  |  |
| ·Add contact information on a responsible person(s)/entity(ies) for the application of the methodology(ies)to the project activity inB.7.4 and Appendix1; |  |  |
| ·Change the reference number fromF-CDM-PDD toCDMPDD-FORM; |  |  |
| ·Editorial improvement. |  |  |
| 04.1 | 11 April 2012 | Editorial revision to change version02 line in history box fromAnnex06 to Annex06b |
| 04.0 | 13 March 2012 | Revision required to ensure consistency with the“Guidelines for completing the project design document form for CDM project activities”(EB66,Annex8). |
| 03.0 | 26 July 2006 | EB25,Annex15 |
| 02.0 | 14 June 2004 | EB14,Annex06b |
| 01.0 | 03 August 2002 | EB05,Paragraph12Initial adoption. |

Decision Class: Regulatory
Document Type: Form
Business Function: Registration
Keywords: project activities, project design document